1) main construction
主体施工
1.
Problems need attention to the installation supervision in the main construction;
安装监理在主体施工时应注意的问题
3) main body constructing technique
主体施工技术
4) main beam construction
主梁施工
1.
Combined with characteristics of the main beam construction of the Yun Yang Yangtse River Highway Bridge, the technical measurements of long-span cable -stayed bridge are introduced in the dynamic state in this paper from the constr uction measurement.
结合云阳长江公路大桥主梁施工的特点,介绍了动态施工中大跨斜拉桥主梁施工测量的有关技术。
5) main cable construction
主缆施工
1.
This paper takes LanCang Jiang suspension bridge as the background project and does researches on the main cable construction under temperature effect.
本论文以澜沧江悬索桥为工程背景,就主缆施工阶段温度效应的施工控制问题,有针对性地展开研究。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条