说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 主塔施工
1.
Main construction technique of south navigable bridge's main pylon of Hangzhou Bay Sea-crossing Bridge
杭州湾跨海大桥南航道桥主塔施工关键技术
2.
Application of Hydraulic Self-Climbing Form to Construction of Pylon atop Pier No.11 of Zhongxian Changjiang River Bridge
液压自爬模在忠县长江大桥11号墩主塔施工中的应用
3.
Girder Construction Technique of Single Tower Cable-stayed Curve Bridge Without Back Cable
独塔无背索弯坡斜拉桥主梁施工技术
4.
Design and construction of Sutong Bridge deep-water main pylon foundations
苏通大桥主塔深水基础的设计与施工
5.
Construction Technology of Hoop Prestressed Cables for Main Tower of Guangzhou Pearl River New Town West-tower
广州珠江新城西塔主塔楼环向预应力拉索施工技术
6.
The Base Slab Construction of 9# King Tower of the Songhuajiang Stayed Cable Bridge in Harbin
哈尔滨松花江斜拉大桥9#主塔承台施工
7.
The Construction Methods of the Outside Tube Wall withφ17.80M under the Tower Shaft in Dragon Mine
龙家堡煤矿主井井塔筒形基础施工方法
8.
Construction of Foundation of Pylon Pier No.5 of Erqi Changjiang River Bridge in Wuhan
武汉二七长江大桥5号主塔墩基础施工
9.
Special Monitoring for Huge Cantilever of CCTV Main Tower during Construction
CCTV主楼双塔间大悬臂施工过程专项监测
10.
Double-wall steel boxed cofferdam construction technology of the Fuyang Lushan large bridge main tower pier
富阳鹿山大桥主塔墩双壁钢套箱围堰施工技术
11.
Construction of Very Long Rock Socketed Piles for North Pylon Pier of Edong Changjiang River Highway Bridge
鄂东长江公路大桥北主塔墩超长嵌岩桩施工
12.
Cantilever Formwork Construction Technology of Special-shaped Main Tower for Self-anchored Suspension Bridge
自锚悬索桥异型主塔悬臂模板施工技术
13.
Analysis and Construction Technology of Lower Cross Beam Pre-stressing of Main Pylon of Minpu Bridge Ⅱ
闵浦二桥主塔下横梁预应力分析及施工技术
14.
The Technique of Cofferdam with Steel Plate Piles Applied on the Construction of Bearing Platform of Main Tower in Jiangxinzhou Large Bridge in Nanjing
南京江心洲大桥主塔承台钢板桩围堰施工技术
15.
Selection and Location of Tower Crane Used in CCTV Main Building
CCTV主楼结构施工用塔式起重机选型和定位
16.
Optimizing Construction Schemes for Lower Cross Beam of Main Tower of Changshou Yangtze River Bridge in Chongqing
重庆长寿长江大桥主塔下横梁施工方案优化
17.
This article revolves around the design and construction technique involving the second main tower pier of the Minjiang Bridge, its platform, suspension box, and cofferdam.
本文主要介绍了闽江大桥2#塔墩承台吊箱围堰的设计及施工方法。
18.
Application of Centralined Slurry Preparetion and Dispersed Grouting in Drilling Construction of Sutong Bridge Main Tower Pier
集中制浆分散净化技术在苏通大桥主塔墩钻孔施工中的应用