说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 阶梯坝面
1)  stepped spillway face
阶梯坝面
2)  stepped dam face
阶梯式坝面
1.
The Dachaoshan hydropower project has adopted the flaring pier stepped dam face and bucket combined energy dissipator in its design, and the prototype observation of overflowing hydraulics under the design water level was carried out in June, 2002.
大朝山水电站采用宽尾墩阶梯式坝面及戽式联合消能工的设计,于2002年6月进行了设计水位下的过流水力学原型观测,针对阶梯式坝面开展了沿程4个台阶上的压力、底流速和掺所的量测,取得了在100m级高坝、单宽流量165m3/s·m条件下的运行资料。
3)  Benched dam
阶梯坝
4)  stepped spillway
阶梯溢流坝
1.
Hydraulic calculation method for deflecting distance of lower nappe profile in dissipator with flaring gate piers and stepped spillway;
宽尾墩阶梯溢流坝出闸室水舌下缘挑距水力计算
2.
Study on hydraulic structure of flaring gate piers locating at the upstream of stepped spillway;
宽尾墩后接阶梯溢流坝面水工设施的研究
3.
Numerical simulation of characteristics of free-surface aeration on stepped spillway;
阶梯溢流坝自由表面掺气特性数值模拟
5)  stepped spillway
台阶坝面
1.
Experimental study on united dissipator with stepped spillway dam surface and flaring gate piers;
宽尾墩与台阶坝面联合消能工的试验探索
6)  flaring pier stepped spillway a bucket basin type of combined energy dissipator
宽尾墩阶梯式坝面戽池联合消能
补充资料:奥三面坝

奥三面坝

Okumiomote Dam


概  述

  奥三面坝位于日本新泻县岩船郡朝日村、三面川水系(Miomotegawa)三面川上,地处磐梯朝日国立公园内。非对称式抛物线混凝土拱坝,最大坝高116m,水库总库容1.255亿m3。工程目的为防洪和发电,兼有减轻下游洪水危胁和维持河道正常功能作用。电站最大装机容量34.5万kW。1981年开工,预计2001年竣工。
  坝址附近山头的高程多在400~500m,相对于河床的高差约250~300m。岸坡陡峻呈"V"形河谷,尤其是河床以上30m的岸坡近于垂直。
  坝址基岩以流纹岩质熔结凝灰岩为主。岩质坚硬,难以爆破,即所谓的"皱胃"基岩。但存在层面和节理等不连续面。
  坝址控制流域面积174.5km2,水库面积4.3hm2,有效库容1.08亿m3,防洪库容0.54亿m3,洪水期兴利库容为0.54亿m3,死库容0.175亿m3。正常蓄水位229m,设计洪水流量2400m3/s。设计洪水位238m,洪水期限制水位213.2m,设计泄流量2900m3/s。
  大坝坝顶高程239m,长244m,坝体积23万m3。设有3个表孔,非常泄洪用,最大泄量2900m3/s,设有1个中孔,正常泄洪用。在高程162m,设1个放水底孔。
  采用隧洞导流,隧洞内径5.8m。坝址区河谷狭窄,岸坡岩石开挖采用台阶式掘进法,并用锚杆加固岩坡。混凝土的浇筑使用两端行走式缆机进行,并用转运车来运送混凝土。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
阶梯状曲流破坝河流  阶梯形变截面桩  阶梯式溢流面  等效阶梯截面  阶梯式变截面梁  阶梯形截面梁  双面阶梯埋氧SOI 
  ©2011 dictall.com