1) hoisting cableway
吊装索道
2) cabin ropeway
吊舱索道
3) cableway bucket
索道吊斗
4) cable erection
缆索吊装
1.
Application of cable erection and strayed knotting method to construction of concrete filled steel tubular arch bridge;
缆索吊装斜拉扣挂法在钢管混凝土拱桥施工中的应用
2.
Through the construction of box arch in Wuyang river grand bridge,the author mainly introduces the construction technology and construction method of large-span arch bridge erection with cableway,carries out checking computations on overall arrangement of cable erection system and cable system,and draws a conclusion that the erection technology has well economic and social benefits.
通过舞阳河特大桥上构箱拱的施工,主要介绍无支架缆索吊装大跨径拱桥的施工工艺和施工方法,对缆索吊装系统的总体布置和扣索系统进行了验算,得出了该吊装工艺经济效益和社会效益显著的结论。
3.
This paper mainly introduces the cable erection construction experience and the key control points of main span arch boxes of Wentanghe Extra Large Bridge on Chongqing-Linshui Expressway.
主要介绍了渝邻高速公路温塘河特大桥主跨拱箱缆索吊装的施工经验及控制要点。
5) cableway erection
缆索吊装
1.
The Research on Construction Technology of Erecting the Half-through Concrete Filled Steel Tube Arch Bridge with Cableway Erection;
缆索吊装法架设中承式CFST拱桥的施工技术研究
6) pipe suspension
管道吊装
补充资料:厂房钢结构组合吊装
厂房钢结构组合吊装
combined hoisting of steel structure for workshop building
采用组合吊装时,要结合结构型式,根据起重设备能力,保证安全、质量,提高作业效率的原则确定构件组合的范围。常用的组合形式有:(l)多节柱的组合,对H形框架结构也可采用柱与梁组合;(2)吊车梁与辅助析架的组合,将吊车梁、辅助析架利用制动板、水平支撑、垂直支撑进行固定,形成组合体;(3)天窗架的组合,将垂直天窗架与屋面、墙面擦条、天沟和支撑等进行组合;(4)墙面系统的组合,以墙皮柱作骨架,将其与墙面镶条、拉条和钢窗等组合在一起.(5)厂房屋面系统整体组合吊装,将2~3棍屋架,与屋架间上下弦的水平支撑、垂直支撑、屋面镶梁、天沟及天窗等全部构件组合成整体进行吊装。 组合吊装一般选用大型塔式起重机或履带式起重机。吊装前要对起重设备和组合构件进行验算,包括:(1)起重机的起重能力(包括起重量、回转半径、起重高度等)复核;(2)组合件整体稳定和局部稳定验算;(3)吊点处局部变形验算和吊点距离计算;(4)提升用绳索和吊具验算。验算结果全部符合技术要求后,方可进行吊装。 (刘庆华)ehangfang gang」旧gou zuhe dlaozhuang厂房钢结构组合吊装(eombined hoisting ofsteel strueture for workshop building)将部分单体构件预先在地面上组拼成整体后,用起重设备提升到设计位置上的作业。这种方法比单体吊装可大量减少高空作业,节省大型起重设备的台班费用,有利于保证结构节点的焊接质量。但施工准备时间较长,结构组合几何精度控制较复杂,并需选用有较大提升能力的起重设备。