1)  overall cost control
全面成本控制
1.
On the overall cost control method in the construction enterprise;
施工企业全面成本控制方法初探
2)  whole process cost control
全过程成本控制
3)  full-life cycle cost control
全寿命周期成本控制
1.
The full-life cycle cost control of power grid construction projects means that from point of whole social view the full-life cycle cost control of power grid construction project is taken as a controlled object to analyse mutual relations between various stage costs,and various key elements costs during the whole cycle through certain techniques and methods.
电网建设项目全寿命周期成本控制是指站在全社会的角度,以电网建设项目的全寿命周期成本为控制对象,通过一定的技术和方法对建设项目寿命周期各个阶段成本、各要素成本之间的相互关系进行分析,采取相应的措施,实现电网建设项目全寿命周期成本最优。
4)  Cost Control
成本控制
1.
Thinking and Countermeasures of Oil Production Cost Control;
浅谈采油成本控制思路与对策
2.
Optimization model for cost control of working fluids in oil and gas wells;
油气井工作液成本控制优化模型
3.
Study on target cost control model of production management planning in steel plant;
钢厂生产经营计划中的目标成本控制模型研究
5)  control cost
控制成本
6)  Cost-control
成本控制
1.
Research on Long-run Effective Mechanism for Cost-Control in Oilfield Enterprises;
油田企业成本控制长效机制研究
2.
Project Program Cost-control Research of Dadingzi Mountain Wharf;
大顶子山码头工程项目成本控制研究
3.
The cost-control is the key-point of a constructional project;and value engineering is the best method to control the cost.
施工项目的管理关键在于成本控制,而价值工程是成本控制的最佳方法。
补充资料:全面成本控制(totalcostcontrol)
  对企业生产经营所有过程中发生的全部成本、成本形成中的全过程、企业内所有员工参与的成本控制。

  (1)全部成本控制对企业生产经营过程中所耗费的全部成本,包括料、工、费各项支出进行严格监督和限制,不权对变动成本要进行控制,对固定成本也要进行控制。

  (2)全过程成本控制对产品设计、工艺、采购、制造、销售、使用的整个过程发生的成本进行控制,不仅对构成产品生产成本的发生过程进行控制,也要对生产前的设计、工艺和生产后的销售、使用所发生的成本进行控制。

  (3)全员成本控制发动企业管理人员、工程技术人员和广大生产员工树立成本意识,参与成本的控制。成本是一项综合性的指标,涉及设计、技术、采购、生产、销售、管理等各项工作,要真正达到成本控制的目的,必须调动和组织企业内部全体员工的积极性,应通过建立经济责任制,把企业的专业成本控制工作和群众性成本控制工作结合起来,上下联系,明确每个员工、每个部门在成本控制中的职责。各项费用定额,费用开支标准,成本目标和降低成本的措施,应广泛发动全体员工讨论,使成本控制工作成为全体员工自己的工作职责,并付诸行动。