说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 格里桥水电站
1)  Geliqiao Hydropower Station
格里桥水电站
2)  Baglihar Hydropower Plant
巴格里哈尔水电站
1.
Analysis of expert determination on points of difference about Baglihar Hydropower Plant under the Indus Waters Treaty
基于《印度河用水条约》的巴格里哈尔水电站纠纷仲裁分析
3)  Xiaqiao hydropower station
下桥水电站
1.
Energy Dissipation & Erosion Protection Design and Preliminary Operating Effect of Arch Dam at Xiaqiao Hydropower Station;
下桥水电站拱坝消能防冲设计与初期运行消能效果
2.
Seepage Analysis on the Downstream of Reservoir at Xiaqiao Hydropower Station and Countermeasures
下桥水电站库区下游渗漏分析及处理对策
3.
Curtain Grouting Engineering Technique Applied to Xiaqiao Hydropower Station
下桥水电站帷幕灌浆施工技术
4)  Gaoqiao Hydropower Station
高桥水电站
1.
Design of sediment prevent for intake of Gaoqiao Hydropower Station;
高桥水电站取水口防沙设计
5)  Qiaogong Hydropower Station
桥巩水电站
1.
Spoil Yard Selection and Soil-and-Water Conservation Design for Qiaogong Hydropower Station Project;
桥巩水电站工程弃渣场选址及水土保持设计
2.
Design and Measurement of First Construction Control Network for Qiaogong Hydropower Station;
桥巩水电站首级施工控制网设计与施测
3.
Design Flood Defining for Qiaogong Hydropower Station;
桥巩水电站设计洪水的确定
6)  Tianqiao Hydropower Station
天桥水电站
1.
Schemes Analysis of Extending Flux for Wiping off Danger of Tianqiao Hydropower Station;
天桥水电站扩泄除险方案分析
2.
Analysis on prototype observation on lifting power of spillway tunnel working gate for Tianqiao Hydropower Station;
天桥水电站泄洪洞工作闸门启闭力原型观测成果分析
3.
Study on Composite Bottom-surface Flow Energy Dissipation and General Operation Alternatives of Tianqiao Hydropower Station;
天桥水电站底面流混合消能及枢纽运行方案研究
补充资料:古里水电站
古里水电站
Guri Hydroelectric Power Station

   委内瑞拉东部卡罗尼河梯级开发(自下而上)的第一级,世界第二大水电站。控制流域面积8.5万平方千米。年径流量1536亿立方米。基岩主要为片麻岩。混凝土重力坝最大坝高162米,坝顶长1400米,右岸联接土石坝长4000米,左岸联接土石坝长2000米。副坝总长32千米。总库容1350亿立方米。有两座坝后式发电厂房,总装机容量1006万千瓦。年发电量 510 亿千瓦时 。泄洪设施为溢洪道,泄量为3万立方米/秒。工程于1963年开工,分3期实施,1986年竣工。
   
   

古里水电站大坝

古里水电站大坝

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条