1) earthworks calculation
土石方量计算
1.
Taking Dacheng-Liugezhuang 110 kV transmission line engineering as an example,of which were constructed recently by the transmission line and substation engineering company,designing idea and method for VEP program are introduced in combination with the program of earthworks calculation designed by the article writer.
以送变电工程公司最近施工的项目“大城—留各庄110 kV线路工程”为例,结合作者最近编制的土石方量计算程序介绍了VEP程序的设计思路及方法。
2) earthworks computation
土石方计算
1.
The paper analyzed several influenced factors of subgrade earthworks computation for expressway.
对影响高速公路路基土石方计算的几个主要因素进行分析,参照实例讨论如何准确、合理地进行土石方数量的计算与调配。
3) calculation on amount of earthworks
土石方工程量计算
4) earthwork calculation
土石方计量
1.
Design of ultrasonic vehicular earthwork calculation system;
超声波车载土石方计量系统设计
5) earthwork calculation
土方量计算
1.
Development of MATLAB toolbox applied to earthwork calculation;
土方量计算的MATLAB工具箱研制
2.
There are some different methods for earthwork calculation,such as square grid,section,contour,DEM method,and so on.
为计算高阜工业园区的土方量,采用方格网法;并重点讨论在不同地形坡度下,得到的不同土方量计算结果;最后根据测区需要,做出合理选择。
3.
There are many algorithms of earthwork calculation.
土方量计算有多种算法。
补充资料:计算机断层扫描法测定骨量
计算机断层扫描法测定骨量
本法适用于测定腰椎骨量,但放射剂量较高。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条