2) construction analysis
施工分析
3) long distance construction
长距离施工
4) adjacent construction
近距离施工
1.
According to the features of control in shield adjacent construction,the control model of the whole process—APLOC has been established based on IMC-PID controller with consideration of the effects of earth balance pressure at workface and shield tail grouting parameter on ground deformation.
针对盾构近距离施工中变形控制的特点,以变形控制为目标,采用系统控制论的思想和方法,提出一种基于内模控制的IMC-PID参数整定方法的盾构施工控制方法。
6) extremely close approaching construction
超近距离施工
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条