1) Tongbai Hydropower Station
桐柏水电站
1.
Construction of Computer Monitoring and Control System for Tongbai Hydropower Station;
桐柏水电站计算机监控系统的构建
2) Tongbo pumped-storage power station
桐柏抽水蓄能电站
1.
According to the experience from data compilation and file for final acceptance of Tongbo pumped-storage power station,the important ways doing a good job on data compilation and file for final acceptance are to change idea,to improve administr.
从桐柏抽水蓄能电站工程竣工资料的整编和归档看:转变观念,健全档案资料管理机构,建立完善的管理制度,强化日常管理工作,并通过合同管理加强资料的管理,加强人员培训以及运用计算机进行资料整编和管理,是搞好工程竣工资料整编和归档的有效重要途径。
2.
The techniques for the excavation expansion of the inclined well of Tongbo pumped-storage power station are optimized on the basis of summing up the previous construction experience from similar projects,especially its lifting system,signal control system and drill blasting,which creates new situation of the construction of inclined well.
桐柏抽水蓄能电站斜井扩挖在总结以往类似工程施工经验的基础上,对提升系统、信号控制系统及扩挖钻爆等工艺进行了优化,开创了斜井施工的新局面,为我国抽水蓄能电站大洞径、长斜井开挖积累了宝贵的经验。
3) Tongbai Pumped-storage Power Station
桐柏抽水蓄能电站
1.
Unit Temperature Test and its Analysis for Tongbai Pumped-storage Power Station;
桐柏抽水蓄能电站机组温度检测及分析
2.
Application of LSD inclined shaft slipform system to Tongbai Pumped-storage Power Station;
LSD斜井滑模系统在桐柏抽水蓄能电站的应用
4) East China Tongbai Pumped-Storage Power Station
华东桐柏抽水蓄能电站
5) Tongbai pumped storage power station
桐柏抽水蓄能电站
1.
Construction of inclined shaft excavation in Tongbai pumped storage power station;
桐柏抽水蓄能电站斜井开挖施工技术
2.
Engineering Characteristics of Dam-body Spillway of Rockfill Dam with Concrete Face Slab for the Tongbai Pumped Storage Power Station
桐柏抽水蓄能电站面板堆石坝坝身溢洪道工程特点
3.
On the basis of technical and economic comparison, the optimization of the construction alternatives for the cofferdam of the upper reservoir of Tongbai Pumped Storage Power Station adopted the alternative of moving the axis of cofferdam towards the bank and the implementation of changing water into dry and combining drainage with pushout.
桐柏抽水蓄能电站上水库进/出水口围堰施工方案的优化,通过技术论证与经济比较,提出了将围堰轴线向岸边外移"改水为旱,排挤结合"的优化方案。
6) Tongzilin water power station
桐子林水电站
1.
Test of optimization of open diversion channel exit and downstream protection in Tongzilin water power station;
桐子林水电站导流明渠出口优化及下游防护试验研究
补充资料:柏高水电站
柏高水电站 |
Pergau Hydropower Station |
| 概 述 |
| 柏高水电站位于马来西亚半岛北部山区的柏高(Pergau)河上,在吉兰丹洲首府哥打马鲁西南约75km。其目的主要为了发电。土坝坝高67m,水库库容0.6亿m3,水电站装机容量60万kW。工程于1991年4月开工,1996年8月完建。 |
| 枢纽布置 |
| 工程主要包括土坝、溢洪道、水电站等。 主坝又称瓜拉永坝(Kuala Yog Dam)为土坝,最大坝高67m,顶长700m。混凝土泄槽式溢洪道位于右岸,泄槽上半部坡度为1∶10,下半部坡度1∶3.5,下接一挑流鼻坎和消力池。 地下洞室包括地下厂房(开挖量12万m3)、变压器室(14364m3)、调压室(7000m3)。地下厂房(96m×30m×39m)内设4台15万kW混流式水轮发电机组,这些机组的出力在12s内可达到48万kW;与厂房相邻的变压器室(80m×14.7m×12.5m)内安装4台3相18万kVA、275kV的变压器,它们与地面开关站相连。 输水系统包括上游引水道、压力输水隧洞和尾水隧洞等。上游引水道包括一条从南面另外7条支流引水到柏高工程的水道,它为一倒拱隧洞,长24km。尾水洞长2800m,尾水流入一个由17m高,1010m长的土坝形成的容量为150万m3的反调节水库。该反调节水库主要用于控制峰荷发电期间的水流量。土坝中央设有一混凝土溢洪道,有闸门控制,最大泄量68m3/s。 |
| 工程施工 |
| 采用隧洞导流。导流隧洞布置在左岸,洞长606m,圆形洞内径4.5m。 主坝共填筑土石方220万m3,它由心墙、分层坝壳和上游抛石护面组成。心墙使用全风化材料,根据分区情况填筑层厚度取300mm和600mm,用压重达65t的轮胎式碾压机和一台D8推土机牵引压实。大部分筑坝材料来自水库开挖区的土料场,并建造一个洗砂厂,将粉砂冲洗掉。该土坝是世界上最早使用喷射灌浆施工法作截水墙的土坝之一。右坝肩处,风化层厚达40~60m,从地表至新鲜基岩面之间采用喷射灌浆,新鲜基岩面以下,采用常用的压力灌浆。这样就减小了开挖量。灌浆系统把40MPa的高压水、空气和浆液混合起来,形成不透水连体柱,截水墙的最小厚度要求为800mm,并对整个喷射灌浆过程进行监控,以保证截水墙需要的最小厚度。 |