Taking the computer-aided cable laying-out for 2×600 MW generating set in the first-stage construction of Shanxi Hequ Power Plant as the example, this paper introduces the flexibility and skills of the application of computer-aided cable laying-out in large-scale power plant.
以山西河曲发电厂一期工程2×600MW发电机组计算机辅助电缆敷设为例,介绍了计算机辅助电缆敷设在大型电厂应用的灵活性及技巧性。
6) the machine of burying submarine cable
海缆埋设机
1.
In this paper,the troubles on the machine of burying submarine cable location are introduced,and gave thoughts of using BP network on burying machine location through studying the characteristic of BP network.
首先介绍在海缆埋设施工中海缆埋设机定位存在的困难,通过对 BP 网络特性的研究,提出将该网络运用于海缆埋设机定位的思路,并对运用埋设机的磁场特性参量和相对布缆船的位置参量进行定位的方法进行探讨和研究。
补充资料:1350mm双流板坯连铸机(重庆钢铁设计研究院设计)
1350mm双流板坯连铸机(重庆钢铁设计研究院设计)
叠 135Omm双流板坯连铸机(重庆钢铁设计研究院设计)