1) pile equipment
![点击朗读](/dictall/images/read.gif)
箱梁安装
1.
Application of cross-mound Longmen support in pile equipment and construction;
![点击朗读](/dictall/images/read.gif)
跨墩龙门架在箱梁安装施工中的应用
2) assembled box beam
![点击朗读](/dictall/images/read.gif)
拼装箱梁
1.
The FRP profile assembled box beam is a box beam composed of pultruded cellular profiles that interlocking connected with other profiles through square tubes and toggle-bars.
FRP型材拼装箱梁是由FRP拉挤型材空心板通过三向连接件、骨状挂钩等销接构件拼装而成的箱梁,具有重量轻、耐腐蚀性能好、施工速度快等突出优点,适用于小跨径公路桥及人行桥。
3) installation of steel box girder
![点击朗读](/dictall/images/read.gif)
钢箱梁吊安
4) Installation of beam slab
![点击朗读](/dictall/images/read.gif)
梁板安装
5) erection of main beam
![点击朗读](/dictall/images/read.gif)
主梁安装
1.
This paper briefly introduces the technical process of the erection of main beam joints and main beam of 5t double-beam gallows crab bucket by usi ng 500×500 portal frame, sleepers and 50 t and 30 t autocranes, and expounds em phatically the overall design of the schemes, the selection of bearing platform s steel columns, the verification of the strength, and the erection of the platf orm, etc.
主要介绍了利用500×500龙门架,道木及50t、30t汽车吊进行5t双梁龙门抓斗主梁接头、主梁安装的工艺过程,并对其方案总体设计情况、支撑平台钢柱的选择、强度校验及平台搭设等环节进行了重点阐述。
6) install crossbeam
![点击朗读](/dictall/images/read.gif)
大梁安装
补充资料:设备安装前的准备工作——机械的开箱检查与清洗
设备安装前的准备工作——机械的开箱检查与清洗 | ||
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条