1) slope beam mount
斜梁安装
2) pile equipment
箱梁安装
1.
Application of cross-mound Longmen support in pile equipment and construction;
跨墩龙门架在箱梁安装施工中的应用
3) Installation of beam slab
梁板安装
4) erection of main beam
主梁安装
1.
This paper briefly introduces the technical process of the erection of main beam joints and main beam of 5t double-beam gallows crab bucket by usi ng 500×500 portal frame, sleepers and 50 t and 30 t autocranes, and expounds em phatically the overall design of the schemes, the selection of bearing platform s steel columns, the verification of the strength, and the erection of the platf orm, etc.
主要介绍了利用500×500龙门架,道木及50t、30t汽车吊进行5t双梁龙门抓斗主梁接头、主梁安装的工艺过程,并对其方案总体设计情况、支撑平台钢柱的选择、强度校验及平台搭设等环节进行了重点阐述。
5) install crossbeam
大梁安装
6) steel girder erection
钢梁安装