1) on/under water engineering
水上水下施工作业
2) construction streamline method
施工流水作业法
4) underwater construction
水下施工
1.
Dynamic monditoring of underwater construction based on multibeam echosounder system and ADCP;
基于多波束系统和ADCP的水下施工动态监测
2.
Described hereby are the technical measures taken in underwater construction in complicated strata with the earth pressure balanced pipejacking machine, with analysis of the accident of No.
叙述了土压平衡顶管机在复杂地层水下施工所采取的技术措施,对施工中1号顶管机出现突沉事故作了分析。
3.
The underwater construction of high pressure spray piles were a success.
通过现场多次试桩结果确定高压旋喷桩的施工参数,实施过程中严格按有关规定进行控制,最终取得高压旋喷桩水下施工的成功,为以后的同类施工积累了宝贵的经验。
6) underwater working tools
水下作业工具
1.
The pressure of output shaft end seal in the gear motor was calculated after analyzing unload pressure for underwater working tools.
通过对水下作业工具管路卸油压力的分析,确定了齿轮马达输出轴轴端密封的压力,分析了唇形骨架密封失效的原因,设计了O形密封圈与L形衬环组成的组合式密封,介绍了密封原理,分析了O形密封圈受力密封状况及L形衬环工作原理,经过对水下作业工具中液压马达轴轴端密封的改造及实验,实现了液压马达输出轴的带压旋转动密封,保证了水下作业工具的稳定、可靠、安全作业。
2.
The construction and principle of the underwater working tools system are introduced in this article , the underwater working tools is studied in detail and be used underwater which is not deeper than 300 m.
介绍了水下作业工具的组成、工作原理、结构等, 较深入地探讨了深水液压系统及水下工具的相关问题。
补充资料:施工作业计划
施工企业统一计划体系中的实施性计划。它把施工企业的施工计划任务、工程的施工进度计划和施工现场具体情况结合起来使之彼此协调,以明确的任务直接下达给执行者,因而是基层施工单位进行施工的直接依据。
施工作业计划分月施工作业计划和旬施工作业计划。其内容一般由三部分组成:①本月(旬)应完成的施工任务。一般以施工进度计划形式表示,确定计划期内应完成的工程项目和实物工程量。②完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量。③提高劳动生产率的措施和节约措施。
施工作业计划分月施工作业计划和旬施工作业计划。其内容一般由三部分组成:①本月(旬)应完成的施工任务。一般以施工进度计划形式表示,确定计划期内应完成的工程项目和实物工程量。②完成作业计划任务所需的劳力、材料、半成品、构配件等的需用量。③提高劳动生产率的措施和节约措施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条