1) construction technique under water
水下施工工艺
2) underwater construction
水下施工
1.
Dynamic monditoring of underwater construction based on multibeam echosounder system and ADCP;
基于多波束系统和ADCP的水下施工动态监测
2.
Described hereby are the technical measures taken in underwater construction in complicated strata with the earth pressure balanced pipejacking machine, with analysis of the accident of No.
叙述了土压平衡顶管机在复杂地层水下施工所采取的技术措施,对施工中1号顶管机出现突沉事故作了分析。
3.
The underwater construction of high pressure spray piles were a success.
通过现场多次试桩结果确定高压旋喷桩的施工参数,实施过程中严格按有关规定进行控制,最终取得高压旋喷桩水下施工的成功,为以后的同类施工积累了宝贵的经验。
4) plain construction technology
清水施工工艺
5) Construction techniques of pure concrete wall
清水砼施工工艺
6) precipitation construction process
降水施工工艺
补充资料:沟渠施工工艺
沟渠施工工艺
ditch construction technology
沟策施工工艺(diteh eonstrUetion techno·logy)用机械开挖排灌沟渠的方法和过程。正确地选择开沟施工机械与方法,能保证开沟质量,做到省工高效。开沟分为明沟和暗沟两种。明沟有排水沟与租水集;暗沟有翰水暗管与排水暗管。 沟梁施工规划与设计排灌沟渠的施工要根据本地区的整个农田水利建设规划要求进行。排灌沟集按其规棋的大小,通常分为干、支、斗、农、毛5级,而且排水沟与灌水集相邻或相间配!,构成排灌沟渠网。农沟和农渠以上各级为固定沟集,毛沟和毛渠则属于末级临时性的排瀚沟集。农田坡度小于1/200时多采用纵向配t,即毛梁方向垂直于地面等高线,坡度大于1/200时多采用横向配置,即毛渠方向平行于等高线。 沟集设计时,首先要按灌溉定倾或排水标准进行流t计算,如在中国东北平原早滋区,每控制100公顷的徽集流t为0.1米3/秒,三江平原排涝按10年一遇标准每控制100公顷的排水沟流量约为0.2米3/秒。沟集底的坡降按地形和土质不同,一般干、支级取l/l0()O一1/3000,斗、农、毛级以下取l/200一l/10(刃。沟渠的边坡角一般为1:1一1: 1.5。底宽按流t取不同值,沟梁流量小于0.3米3/秒时可取。.2一0.5米,0.3一1.0米3/秒时取0.6一l米,l一2米“/秒时耻1一1.5米。底宽与水深之比值通常为1一3o斑集的水面往往在原地面以上,因此两侧要有集堤,堤顶要求高出水面0.2一0.6米,堤顶宽度0.5一1.25米.流最越大其值也越大。排水沟的底宽要比相同流t的灌集大一些,而且要求沟旁无堤,因此需把挖沟的土方散到田面上去。根据上述设计,绘出沟渠的纵横断面图,以供施工。通常还要进行土方量的计算,做为安排施工机械投放t和计划进度的依据。地下暗管排斑规划设许按满足物水指标、明(沟)暗结合、排灌结合等原则做出。 机械配备按沟渠的种类与规格,选用不同的机械。干、支级大型沟渠多以农用推土机、农用铲运机为主:斗级中型沟集可配备农用推土机、农用铲抛机和农用液压挖掘机;农、毛级小型沟渠则选用桦式开沟犁或旋转开沟机,而旋转开沟机多用于排水沟工程。地下排徽暗管工程.主要使用开沟幼管机。根据施工要求和现场情况可组织多种和多台机械施工,还可配备适t的平地机、松土机等辅助机械,在施工时要合理安排,充分发挥各种机械的性能,以提高效率和施工质量。 明沟施工首先放线与找平,即按规划设计,在施工现场把明沟的中心线用木桩标出,如图1中C,、图3推土机开挖沟渠 铲抛机用来开挖沟宽5~15米的中型沟渠效率较高。施工时,机组沿沟渠中心线从中间向外绕圈作业.将土分层抛到沟外.直到预定宽度和深度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条