1) river basin development
流域开发
1.
The huge achievements in the aspects of hydropower station construction, river basin development and long distance water diversion have been gained.
新中国成立后,新疆水利水电事业取得了长足的发展,在水电站建设、流域开发和长距离调水等方面取得了巨大的成就,并在筑坝技术及大坝基础处理、沙漠渠道、软岩隧洞、大流量导虹吸施工、渠道膨胀岩处理和干旱、高寒地区施工等领域积累了丰富的经验。
3) watershed exploitation
流域开发
1.
As the anthropogenic disturbance on large river systems become common,the riverine function′s degradation is often mentioned in the contemporary river management studies and form one of the major challenges in the fields of watershed exploitation.
保持河流各方面整体协调是流域开发研究的重点和必然趋势,研究水沙变异条件下河流系统的调整机理,对于河流健康的保障具有重要意义。
2.
And based on these characteristics, the paper brings forward a water resources’ utilization mode of watershed exploitation direction and groundwater reservoir technology, and furthers the conclusion that karst and valley filling sys.
在此基础上,提出了大连水资源开发应以流域开发为指导思想、以地下水库为技术方法的加大开发地下水水资源利用模式,并进一步得出岩溶含水系统与河谷砂砾石堆积具有较大开发潜力而基岩裂隙含水系统开发难度较大的结论。
4) watershed development
"流域化"开发
5) River basin development
河流流域开发
补充资料:长江流域梯级开发
长江流域梯级开发
cascade development on Changjiang River Valley
水布娅 ﹄勺 n J任500400 300 200100︵已小粗哪袭咪)即帷芭王沱招徕河距清江河口里程(km)~山~~~~一一~~一~-一-~300思龟200 施山 河 图2清江梯级开发方案纵剖面示意 兴建高坝的条件;河道含沙量不大,水库可长期使用, 规划可装机289lMW,多年平均年发电量为84.9亿 kw·h。 清江干流河段分三级开发,即水布娅(1 49lMW)、 隔河岩(1 200MW)、高坝洲(20oMW)(图2)。其中, 隔河岩水电站于1 986年开工,1994年建成。最大坝高 151m,电站装4台单机容量300MW机组。高坝洲水 电站位于隔河岩水电站下游,最大坝 高57m,其水库是隔河岩下游的反调 节水库。水布娅水电站最大坝高 228m,装7台单机容量213MW机 组,是清江干流的骨干电站。 金沙江梯级开发金沙江是长 江上游的重要支流之一。自云南省 石鼓至四川省宜宾的河段长约1300 km,集中落差1685m。宜宾以上流域 面积47.3km“,多年平均流量4610 m3/s,多年平均径流量1456亿m“。 宜宾以上干流可开发水能资源5891。 Mw,多年平均年发电量3233亿kw·h。这口河段由 于水量充沛、落差集中、淹没损失小,动量指标优越, 但区域地质情况复杂,地震烈度大,交通不便,地下工 程量大,所以开发难度大。 按规划,石鼓至宜宾河段拟分8级开发,即虎跳峡有(600oMW)、洪门口(400oMW)、皮厂(5500MW)、站比较集中的一条河流。三座最大的水库分别为两河口(84亿m3)、锦屏一级(100亿m3)和二滩(58亿m“)。前两座是梯级中最大的调节水库。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条