说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 流域滚动开发
1)  development in the rolling way in river basins
流域滚动开发
1.
The status quo of and future difficulties confronting hydropower development in the rolling way in river basins are analyzed and the corresponding countermeasures proposed.
对水电流域滚动开发的现状和面临的困境进行了分析 ,并有针对性地提出了发展对策 。
2)  progressive development
滚动开发
1.
In Xuzhuang oilfield,the structure is complex,the seismic data is bad,and the progressive development is difficult.
许庄油田构造复杂,地震资料差,滚动开发难度大,提出了以地质思想为指导逐步滚动开发的理念,以许5-1断块周边地区的滚动开发实践为例,总结了适合复杂小断块油田滚动开发的思路和经验,取得了新成果。
2.
It is featured by fractural faults,severe multiple and igneous rocks,thus the technology of fine structural interpretation plays key role in progressive development of little fault block oilfield.
素有“地质家考场”的江苏油田地下情况复杂 ,断层破碎 ,火成岩发育 ,多次波严重 ,因此 ,构造精细解释在复杂小断块的滚动开发中起着至关重要重要的作用。
3.
However, in 2001, great progress in progressive development has been made in this block by using advanced software, new technology and the combining of many technologies.
2 0 0 1年引进先进软件 ,充分利用新技术新工艺 ,发挥多项技术综合应用的优势对濮 92块实施滚动开发 ,取得了较大突
3)  rolling development
滚动开发
1.
Discussions on the benefits of the power generation of Three Gorges Project and the rolling development of the Jinsha River;
谈三峡发电效益和滚动开发金沙江
2.
In the light of the complexity,rolling development has gained better effect by applying latest theory of transform fault belt according to specific structural model through fine structure explain and implement of key-well.
进行滚动开发,取得了较好的开发效果。
3.
Based on the complexity of the ground and underground condition of Daqing peripheral oilfield, this paper fully depicts the successful practice of rolling development aiming at increasing successful drilling rate and decreasing developing risk.
针对大庆西部外围油田地下条件十分复杂的问题 ,叙述了围绕提高钻井成功率 ,降低开发风险所进行的滚动开发的成功实践 ,把 1983— 2 0 0 1年整个滚动开发过程依据不同时期滚动开发目标、实践目标的思路及技术特点分为三个阶段 ,即滚动开发初级阶段 ,滚动开发发展阶段 ,滚动开发提高完善阶段 ,并分阶段阐述了应用地震地质综合预测技术 ,解决不同油田复杂地质情况的具体作法和应用效果。
4)  river basin development
流域开发
1.
The huge achievements in the aspects of hydropower station construction, river basin development and long distance water diversion have been gained.
新中国成立后,新疆水利水电事业取得了长足的发展,在水电站建设、流域开发和长距离调水等方面取得了巨大的成就,并在筑坝技术及大坝基础处理、沙漠渠道、软岩隧洞、大流量导虹吸施工、渠道膨胀岩处理和干旱、高寒地区施工等领域积累了丰富的经验。
5)  watershed exploitation
流域开发
1.
As the anthropogenic disturbance on large river systems become common,the riverine function′s degradation is often mentioned in the contemporary river management studies and form one of the major challenges in the fields of watershed exploitation.
保持河流各方面整体协调是流域开发研究的重点和必然趋势,研究水沙变异条件下河流系统的调整机理,对于河流健康的保障具有重要意义。
2.
And based on these characteristics, the paper brings forward a water resources’ utilization mode of watershed exploitation direction and groundwater reservoir technology, and furthers the conclusion that karst and valley filling sys.
在此基础上,提出了大连水资源开发应以流域开发为指导思想、以地下水库为技术方法的加大开发地下水水资源利用模式,并进一步得出岩溶含水系统与河谷砂砾石堆积具有较大开发潜力而基岩裂隙含水系统开发难度较大的结论。
6)  basin development
流域开发
补充资料:长江流域梯级开发


长江流域梯级开发
cascade development on Changjiang River Valley

  水布娅 ﹄勺 n J任500400 300 200100︵已小粗哪袭咪)即帷芭王沱招徕河距清江河口里程(km)~山~~~~一一~~一~-一-~300思龟200 施山 河 图2清江梯级开发方案纵剖面示意 兴建高坝的条件;河道含沙量不大,水库可长期使用, 规划可装机289lMW,多年平均年发电量为84.9亿 kw·h。 清江干流河段分三级开发,即水布娅(1 49lMW)、 隔河岩(1 200MW)、高坝洲(20oMW)(图2)。其中, 隔河岩水电站于1 986年开工,1994年建成。最大坝高 151m,电站装4台单机容量300MW机组。高坝洲水 电站位于隔河岩水电站下游,最大坝 高57m,其水库是隔河岩下游的反调 节水库。水布娅水电站最大坝高 228m,装7台单机容量213MW机 组,是清江干流的骨干电站。 金沙江梯级开发金沙江是长 江上游的重要支流之一。自云南省 石鼓至四川省宜宾的河段长约1300 km,集中落差1685m。宜宾以上流域 面积47.3km“,多年平均流量4610 m3/s,多年平均径流量1456亿m“。 宜宾以上干流可开发水能资源5891。 Mw,多年平均年发电量3233亿kw·h。这口河段由 于水量充沛、落差集中、淹没损失小,动量指标优越, 但区域地质情况复杂,地震烈度大,交通不便,地下工 程量大,所以开发难度大。 按规划,石鼓至宜宾河段拟分8级开发,即虎跳峡有(600oMW)、洪门口(400oMW)、皮厂(5500MW)、站比较集中的一条河流。三座最大的水库分别为两河口(84亿m3)、锦屏一级(100亿m3)和二滩(58亿m“)。前两座是梯级中最大的调节水库。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条