1) construction treating countermeasures
施工处理对策
2) construction countermeasure
施工对策
1.
Major geological questions of Daluliangzi tunnel and construction countermeasures;
大路梁子隧道主要地质问题及施工对策
2.
As a conclusion,construction countermeasures were also brought forward for structures of high-pressure water.
文中介绍了几种典型高压涌水形成的地质条件,为了防止在隧洞掘进过程中出现突发性高压涌水,采用宏观地质预报、微观地质预报及探地雷达预报提前预测可能存在高压涌水的位置、水量和水压等,并且对一些富含高压水构造提出了一些相应的施工对策。
4) treatment countermeasures
处理对策
1.
Current status of drinking water source pollution of Chaohu lake and treatment countermeasures thereof;
巢湖饮用水源污染现状与饮用水处理对策
5) treatment measures
处理对策
1.
Geotechnical problems caused by new embankment splicing with old one on soft ground and treatment measures;
软土地基新老路堤搭接的岩土工程问题和处理对策
2.
The sediment in cidar is mainly bio-sediment and the treatment measures include: ①to strengthen technicians′ sense of responsibility to aseptic manipulation and operation rules be followed strictly and workshop, working environment and production facilities cleaned and sterilized regularly; ②addition of 0.
处理对策为:①树立严格的无菌观念,严格遵守生产操作规程。
3.
This paper gives a general statement on the current situation and treatment measures of urban house refuse in Datong Cit
城市生活垃圾的产出量在增加,其构成成分也越来越复杂,处理难度和处理成本在逐渐加大,城市生活垃圾问题已越来越受到全世界的关注,文章就大同市城市生活垃圾的现状及处理对策做出概述。
6) Treatment countermeasure
处理对策
1.
Based on the phenomenon of abnormal temperature difference of the effluent coolant of 600 MW generator s stator wingding bar in a power plant during operation,this paper provided a comprehensive analysis for its causes,outlined the solution process,and proposed the treatment countermeasures for abnormal temperature difference of effluent coolant.
针对某电厂600MW发电机定子线圈上层线棒运行中出水温差出现的异常现象,对异常原因进行了综合分析,简述了处理过程,提出了在发电机出水温差数据异常时的处理对策。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条