说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 句库 -> 施工处理
1.
On construction treatment measures of bored piles in volcanic lavas
谈溶岩地质条件下钻孔灌注桩的施工处理措施
2.
Basic design and construction handling of bridge in karst area of Yunnan
云南岩溶区桥梁基础设计与施工处理
3.
On treatment method for bridge pile foundation construction in karst areas
浅谈岩溶地区桥梁桩基施工处理方法
4.
Cause of Artifical Dig-in-place Piles Failure and Summary Experience
人工挖孔桩施工常见问题及处理措施
5.
Problems occurred in bored pile construction and treatment measures
钻孔桩施工中出现的问题及处理措施
6.
Construction technology of the cement injection pile in soft soil foundation treatment
粉喷桩在软土地基处理中的施工工艺
7.
Special Treatment in Construction of Manual Pile Foundations
人工挖孔桩施工中几个特殊问题处理
8.
Preliminary analysis on waste water treatment for Huashangou Hydropower Station in construction period
华山沟水电站工程施工期废水处理措施初探
9.
Problems and Its Treatment Measures in Interlocked Precast Concrete Block Construction
联锁式砼预制块施工中的问题及处理措施
10.
Pumping concrete construction quality control and crack treatment
泵送混凝土施工质量控制和裂缝处理措施
11.
Common quality problems encountered in pile foundation construction of bridge and prevention and treatment measures
桥梁桩基施工中常见质量问题和预防处理措施
12.
The quality problems and treatments in the construction of sinking pipe cast-in-place pile
沉管灌注桩施工中的质量问题及处理措施
13.
Measures against Problems in Power Supply for Construction of Qiaogong Hydropower Station
桥巩水电站施工用电存在问题的处理措施
14.
On the exploration of typical karst treatment measure in tunnel construction under complex geological condition
复杂地质条件下隧道施工中典型岩溶处理措施
15.
On the bad geological phenomenon in Yufeng mountain tunnel construction and treatment measures
玉峰山隧道施工中不良地质现象及处理措施
16.
Cracks Treatment Construction Technology of the Danjiangkou Dam Heightening Project
丹江口大坝加高初期工程裂缝处理施工工艺
17.
Study on Proccessing Construction Lofting Graphics in Arch Dam CADC
拱坝CADC中施工放样图形处理研究
18.
Accident Prevention and Treatment in Bored Pile Construction
钻孔灌注桩施工中事故的预防及处理