1) desilting basin
沉沙池
1.
The data of sudden change of the main flow observed in a large-scale desilting basin located behind the main dike in the lower Yellow River indicated that the Markov probability prediction method can be used to predict the numbers of sudden change of the main flow with accuracy.
本文利用黄河下游淤背大型沉沙池主流突变次数实测资料的计算表明,采用马尔科夫概率预测法预报主流突变次数概率具有一定的准确度,游荡型河道的主流突变次数过程符合马尔科夫过程(MarkovProcess)。
2.
In this paper,according to the theory of over-satnrate transport concentration,the author puts forward calculation method of the whole process of silt movement on movable bed in desilting basin,including all calculations such as hydraulic factors,sedimentation rate,sedimentation feature and period etc.
根据一度流超饱和输沙法忽略挟沙力影响的基本计算式,给出沉沙池包括水力要素、泥沙沉降效率和淤积形态的动床计算方法,得出沉沙池泥沙运动的全过程,从而达到沉沙池合理布置和加快设计速度的目的。
3.
The paper also provides structural drawings of the desilting basin and the storage tank with volu.
文中提出了一个容积为147 m3的窑窖和沉沙池结构设计图。
2) sand basin
沉沙池
1.
Study on effect of spillway trough on deposition efficiency of intermittent scouring sand basins;
溢流槽对定期冲洗式沉沙池沉淀效率的影响分析研究
2.
The appraisal and analysis on geology characteristics of sand basin of Dayudu Dianguan station;
大禹渡电灌站沉沙池工程地质评价分析
3.
Analysis and check on the calculation methods of silt deposition rate in the sand basin of hydropower station;
水电站沉沙池泥沙沉降率计算方法分析与检验
3) sediment basin
沉沙池
1.
Experiment study of flow s adjusting with flow board in sediment basin;
沉沙池中调流板对水流调节作用的试验研究
2.
It is pointed out that adopting reservoir instead of sediment basin is feasible.
通过试验表明以水库代替沉沙池是可行的。
4) settlingbasin
沉沙池
1.
Theκ εturbulentmodelisusedtosimulatetheverticalflowfieldofsettlingbasin .
采用κ ε紊流模型 ,对沉沙池立面流场进行了数值模拟。
2.
Itisaninterestingquestionforstudytoenablesettlingbasinwithspecialsettlingefficiencyin large -scaleirrigationdistrictinordertoprolongoperationtimeofsettlingbasinandeffectivelyuselandre sources.
要求大型放淤工程的沉沙池具有沉粗排细特殊功能 ,以延长沉沙池的使用时间 ,有效利用土地资源 ,是一个值得探索的课题。
3.
Itcanbeseenthattheresultsofthismathematicalmodelstudydoesreallyforeseetoknow howtoregulatethedischargeandwaterlevelprocessesofthesafeoperationattheinletandtheoutletinthe settlingbasin ,anditcanbeusedinoperationschemestudyofthesett.
利用泥沙数学模型 ,对胜利油田耿井水库 2 # 沉沙池运行特性进行了系统分析。
5) settling basin
沉沙池
1.
The design thought of the settling basin for sediment trapping by the vortex tube is presented in this paper with a practical engineering example.
简述涡管排沙式沉沙池的设计思路 ,结合新疆金沟河渠首电站 ,介绍涡管排沙式沉沙池的原型观测结果 ,并对沉沙池的运用效果进行了分析 。
2.
This paper presents the experimental study of sand trapping by vortex tube in settling basin.
通过对涡管排沙式沉沙池的试验研究,证明这种沉沙池具有较好的沉沙及排沙作用,可应用于排除水电站引水渠道中的悬移质泥沙。
3.
According to the working character of a hydraulic-continuative flushing settling basin and by means of hydraulic model experiment,a hinge problem of application of the spatially varied flow equation to a hydraulic-continuative flushing settling basin is preliminarily solved and the numerical solutions of these equations are proposed.
本文根据连续冲洗式沉沙池的工作特点,通过水力学模型试验研究初步解决了沿程变量流方程用于连续冲洗式沉沙池计算的关键问题,并提出了求解方程的数值计算方法。
6) sedimentation basin
沉沙池
1.
The results show that,the main reason for the severe deposition of the west sediment transport canal is that the surface slope is much smaller than the design slope owing to the sediment deposition in the sedimentation basin at the tail of the west sediment transport canal.
结果表明:西输沙渠尾沉沙池口淤高导致水面比降远小于设计比降是西输沙渠泥沙严重淤积的主要原因;西输沙渠的泥沙淤积主要是溯源淤积,由于入池水流不畅、出口处落差较小、日常引沙量较大导致泥沙淤积严重是造成西沉沙池淤沙容积严重不足的主要原因。
2.
According to the design requirements of water diversion for sediment control of the Yangtze River to Han River Water Transfer Project, the sediment accumulation conditions in the water diversion canal with or without sedimentation basin are researched on the basis of basic hydrology sediment and engineering data by one-dimensional constant flow heterogeneous sand mathematical model.
根据引江济汉工程渠道引水防沙的设计要求,在收集基本水文泥沙和工程基础资料的基础上,运用一维恒定流非均匀沙数学模型,研究了不设沉沙池和设沉沙池后引水渠道内泥沙淤积情况,模型计算结果可以为引江济汉工程中渠道引水防沙设计提供依据。
补充资料:沉沙池
沉沙池 sedimentation basin 沉淀水中大于规定粒径的有害泥沙,使水的含沙量符合水质要求并与下游渠道挟沙能力相适应的水池。其断面远大于引水渠道断面,水流至其内流速骤减,挟沙能力降低,泥沙遂沉于池中。进出口常设闸门。应在池中沉淀泥沙的最小粒径及沉于池中泥沙的沉降百分比,由用水性质确定。沉沙池按位置分为渠首沉沙池和渠系内沉沙池;按冲洗设备分为水力冲洗式沉沙池和机械清淤式沉沙池,前者又分为定期冲洗式(沉沙与冲洗交替进行)和连续冲洗式(供水和冲沙同时进行,多用于含沙量较大,颗粒较粗,且不允许中止供水的情况);按沉沙池的数目分为单室式和多室式;按平面布置分为直线形沉沙池和曲线形沉沙池。此外,黄河下游引黄灌区,常结合放淤改土使用条渠形沉沙池,淤满后即用于耕种。
|
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条