说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 那新水电站
1)  Naxin Hydropower Station
那新水电站
1.
Test Research on Flip Bucket Structure of Spillway Outlet at Naxin Hydropower Station;
那新水电站溢洪道出口挑坎结构形式的试验研究
2)  Naen Hydropower Plant
那恩水电站
1.
Based on a detailed introduction of the design process of construction diversion tunnel for Naen Hydropower Plant,the author analyzed the diversion standard and measure for main dam construction,demonstrated the layout of freeflow diversion tunnel and hydraulic calculation,and discussed the tunnel lining and cofferdam elevation.
详细介绍了那恩水电站施工导流隧洞的设计过程,分析了大坝施工导流标准和方式,论述了无压导流隧洞的布置、水力计算,并对导流洞的衬砌,围堰高程的确定进行了探讨。
3)  Nalan Hydropower Station
那兰水电站
1.
Concrete Face Gravelfill and Rockfill Dam of Nalan Hydropower Station on Deep Alluvium;
趾板置于覆盖层的那兰水电站面板砂砾石坝设计研究
4)  Nina hydropower station
尼那水电站
5)  Naban hydropower plant
那板水电站
1.
An introduction was made on the configuration and technical features of micro-computer comprehensive automation system of Naban hydropower plant,including hardware,software and functional design.
介绍了那板水电站微机综合自动化系统的系统结构及技术特点,硬件、软件配置及功能设计,分析了该系统投运后对整个电站提高劳动生产率、操作自动化及设备管理水平等产生的积极效果。
6)  Xinzhuang Hydropower Station
新庄水电站
补充资料:新阿瓦年达瓦水电站

新阿瓦年达瓦水电站

Nova AvanhandavaHydropower Station


概  述

  新阿瓦年达瓦水电站位于巴西圣保罗州境内的巴拉那河支流铁特河上。大坝为堆石坝和均质土坝,最大坝高71m,水库总库容31亿m3,电站装机容量30万kW。工程以发电和航运为主,1978年开工,土建工程于1982年完工。
  坝址位于巴拉那冲积平原上,基岩为玄武岩。坝址以上集水面积6.5万km2,多年平均流量591m3/s;实测最大洪水流量2740m3/s。水库正常蓄水位358m,水库面积227km2,最低运行水位356m,最高运行水位358.5m。有效库容23亿m3
  工程包括溢洪道、电站进水口、厂房和左右岸的土石坝和船闸。溢洪道位于河床,船闸位于右岸堆石坝的右侧。
  大坝坝顶总长2000m,坝顶高程361.5m。右岸堆石坝长920m,高25m,由斜心墙和堆石坝壳组成。左岸均质土坝长610m,高40m,用粘土填筑。溢洪道分4孔,每孔尺寸15m×15m,按万年一遇洪水设计,溢洪道最大泄洪量7790m3/s。船闸分2级,中间由690m长的航道连接,船闸水深3.5m。闸室长166m,有效长度142m,宽12.1m。室内式厂房长97m,装机3台,水轮机为转浆式,单机容量10万kW,三相同步发电机额定功率11.1万kVA,功率因数0.9。
  工程填筑土石191.7万m3,浇筑混凝土76.3万m3
  工程的第二个阶段,通过溢洪道下部的8条5m×8m隧洞导流。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条
电车站就在那儿。  水电站  小水电站  水电站群 
  ©2011 dictall.com