According to the operation requirements of power grid system, Chashma NPP low MCP rotation speed and low loop flowrate reactor trip setpoints were calculated.
本文通过对电网运行要求的分析 ,得到了恰希玛核电厂主泵低转速和一回路低流量停堆整定值 ,随后的安全验证表明了其对冷却剂流量降低事故保护的有效
2.
The original flow redistribution model in FRAP T6(Fuel Rod Analysis Program——one of the codes in LBLOCA analysis package) is replaced by newly developed model and Chashma NPP LBLOCA is reanalyzed.
用COBRA Ⅳ Ⅰ子通道程序详细分析了流道阻塞后的流场 ,改进了大破口失水事故分析软件包中燃料棒包壳温度分析程序FRAP T6 ,对恰希玛核电厂大破口失水事故作了分
4) nuclear power project
核电工程
1.
Application of three dimensional design in nuclear power project;
三维设计在核电工程中的应用
2.
Study on investment control in the design phase of nuclear power project;
浅谈核电工程设计阶段的投资控制
3.
This paper presents the characteristics of nuclear power projects and the concept of nuclear safety culture.
本文介绍了核电项目工程的特点和核安全文化的概念,阐述了在核电工程项目中,建立以核安全文化为纽带维系项目管理团队和保证项目管理的必要性,并以岭澳核电工程项目为例进行了分析。
5) nuclear power projects
核电工程
1.
Cash flow forecasting model for nuclear power projects;
核电工程现金流预测模型
2.
Management information system for cost schedule integration control for nuclear power projects;
核电工程投资与进度集成控制管理信息系统
6) Nuclear power engineering
核电工程
1.
Based on the general project management maturity model,this paper discussed the establishment of nuclear power engineering project management maturity model in China,and proposed a basic framework in order to provide a way for improving and evaluating the ability of nuclear power project management in China.
借鉴国际上通用的项目管理成熟度模型,对我国核电工程项目管理成熟度模型的建立进行了探讨,并提出了一种基本框架,以期为适应核电项目及其环境特点的核电工程项目管理能力的评价与持续改进,提供一种途径与方法。
补充资料:益希卓玛
益希卓玛
汉名王哲。甘南藏族自治州人。中共党员。1948年肄业于上海复旦大学社会系。1938年参加抗日救亡运动,中学、大学时期皆积极参加学生运动,1949年后历任中央民委政策研究干部、编辑、记者,1963年回到故乡,从事专业文学创作,甘南藏族自治州文化局专业作家,文学创作一级。1954年开始发表作品。1983年加入中国作家协会。著有儿童长篇小说《清晨》,儿童短篇小说《娜珍走向太阳房》,散文《山谷里的变化》,报告文学《日喀则的时代脉搏》、《青藏高原上的太阳房》等。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条