1) Gaixiakan water power station
盖下坎水电站
1.
Analysis of left bank slope stability in Gaixiakan water power station;
盖下坎水电站左岸拱间槽边坡稳定性分析
3) Underwater rock bank
水下岩坎
4) Xiaqiao hydropower station
下桥水电站
1.
Energy Dissipation & Erosion Protection Design and Preliminary Operating Effect of Arch Dam at Xiaqiao Hydropower Station;
下桥水电站拱坝消能防冲设计与初期运行消能效果
2.
Seepage Analysis on the Downstream of Reservoir at Xiaqiao Hydropower Station and Countermeasures
下桥水电站库区下游渗漏分析及处理对策
3.
Curtain Grouting Engineering Technique Applied to Xiaqiao Hydropower Station
下桥水电站帷幕灌浆施工技术
5) underground hydropower station
地下水电站
6) Xiafu Hydraulic Complex
下福水电站
1.
The electric power market and grid structure changed a lot after Xiafu Hydraulic Complex was put into operation.
下福水电站投产后,由于周边的电力供应市场及网架结构发生了较大变化,为了适应市场要求,通过分析比较,对主接线110 kV母线进行分段技术改造。
补充资料:坎班贝水电站
坎班贝水电站 |
Cambambe Hydropower Station |
| 概 述 |
| 坎班贝水电站位于安哥拉境内北宽扎省栋多市附近的宽扎(Cuanza)河上,工程目的是发电。工程分两期施工,第一期工程建一座68m高的拱坝和装机26万kW的地下电站,于1959年开工,1962年建成;第二期工程包括将坝加高20m,并在右岸建一座装机容量为52万kW的新地下电站,1972年完建。 |
| 枢纽布置 |
| 枢纽建筑物由大坝、泄水建筑物和地下电站等组成。 大坝为三圆心双曲拱坝,第一期最大坝高68m,坝顶高程112.75m,最终加高到88m,坝顶高程达到132.75m。坝顶长度300m,顶厚3.0m,底厚13.3m,大坝体积21.7万m3。 溢洪道为堰顶式,初期实行自由溢流,后期安装7扇9m×8.5m的闸门。当库水位高出正常水位10m时,泄流量达9000m3/s。采用挑流消能。 水库设1个大流量泄水底孔和1座冲沙孔。泄水底孔位于右岸,由导流洞改建而成,安装有1扇弧形调节闸门,最大设计流量800m3/s。冲沙孔穿过坝体,下泄流量140m3/s,在雨季连续工作以确保进水口建筑物排沙。 第一期地下厂房建于右岸,分两期安装,每期安装2台6.5万kW的机组。水轮机为竖轴混流式,平均水头112m,转速231r/min。发电机为自承式。第二期地下厂房也设在右岸,厂房内安装4台13万kW的水轮发电机组。 为了修建混凝土薄拱围堰,先修建1座土石围堰,截流时,将1根预浇的钢筋混凝土柱推倒到河中,然后铺设1道钢筋网,接着在钢筋网上游抛填石块,迫使河水从导流隧洞中通过。 |