1) Three Gorges Underground Power Station
![点击朗读](/dictall/images/read.gif)
三峡工程地下电站
1.
Excavation of Arch Crown of Main Powerhouse of the Three Gorges Underground Power Station;
三峡工程地下电站主厂房顶拱跨度32。
2) Three Gorges underground power plant
![点击朗读](/dictall/images/read.gif)
三峡地下电站
1.
The tailwater damping well for the Three Gorges underground power plant is built in narrow space with high safety risk.
三峡地下电站尾水阻尼井具有施工环境小、安全隐患大、施工工期紧、过流面质量要求高等特点。
3) three gorges right bank underground power station
![点击朗读](/dictall/images/read.gif)
三峡右岸地下电站
1.
Measurement analysis of the bonding strength of shotcerting of three gorges right bank underground power station;
浅谈三峡右岸地下电站喷射混凝土粘结强度检测分析
4) three gorges power station
![点击朗读](/dictall/images/read.gif)
三峡电站
1.
Review and Prospect of Main Protection Design for Hydro-Generators of Three Gorges Power Station;
三峡电站水轮发电机主保护设计回顾与展望
2.
Influence of Peak Modulation of Three Gorges Power Station in Flood Season on the Navigation Conditions of the Reach Between the Two Dams;
三峡电站讯期调峰对两坝间河段通航条件影响的研究
3.
Effects of peak regulation at Three Gorges Power Station on navigation;
![点击朗读](/dictall/images/read.gif)
三峡电站调峰流量对航运的影响分析
5) TGP
![点击朗读](/dictall/images/read.gif)
三峡电站
1.
Experiment Study on the Influence of TGP Regulate Peak Flood to the Navigational Condition Between Two Dams;
三峡电站汛期调峰对两坝间通航条件影响试验
2.
In technology design stage,the cushion layer embedding and pressure controlled embedding patterns for TGP s unit spiral case were studied,and study for direct embedding scheme was conducted based on designed pressure controlled scheme in pre-stage.
三峡电站机组蜗壳在技术设计阶段研究了保压方案和垫层方案,直埋方案研究是在先期按保压方案设计的基础上进行的。
3.
A large quantity of output of gigantic TGP will be sent to Mid-China Electric System, and will be over 10% capacity of the system, hence, it will give an important impact to the system.
三峡电站地处华中,规模巨大,建成后送华中容量超过华中电网装机总容量10%,将对华中电力系统的运行产生重要影响。
6) Three Gorges Hydropower station
![点击朗读](/dictall/images/read.gif)
三峡电站
1.
Application of positioning technology to ALSTOM generator set installation in Three Gorges hydropower station
三峡电站ALSTOM发电机组定位技术方案
2.
Using this model the optimum compensating dispatching in the cooperation of Three Gorges hydropower station with the hydropower station group .
在对三峡电力系统及电网内大型水电站特性分析的基础上,以提高水电站群整体调峰能力为目标,建立了水电站群优化补偿调度计算模型;并应用该模型对三峡电力系统水电站群与三峡电站联合运行进行了优化补偿调度研究。
3.
Taking Three Gorges hydropower station as engineering background,the linear interpolation technique to construct the pulsating pressure in the whole hydro-turbine flow passage is brought based on VGS hydro-turbine model test and finite element method.
三峡电站厂房结构的振动问题是三峡工程建设的关键问题之一。
补充资料:长江三峡工程
长江三峡工程,是一项容防洪、发电、航运、养殖和供水于一体的大型综合水利枢纽工程。坝址选在湖北省宜昌县境内三斗坪镇。工程的拦江大坝全长
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条