1) cost estimation
![点击朗读](/dictall/images/read.gif)
造价估测
1.
Study on cost estimation methods and application of BP neural network model;
![点击朗读](/dictall/images/read.gif)
造价估测方法的研究和BP神经网络模型的应用
2) cost estimation
![点击朗读](/dictall/images/read.gif)
造价估算
1.
Application of BP neural network in engineering cost estimation;
![点击朗读](/dictall/images/read.gif)
BP神经网络在工程造价估算中的应用
2.
Indefinite project cost estimation based on neural network;
![点击朗读](/dictall/images/read.gif)
基于神经网络非确定性工程的造价估算
3.
With plethora of the historic data,artificial neural network based on BP algorithm provides a practical solution for that problem and it is applied to determine cost estimation through "distilling" rules from the materials of completed projects.
通过案例实证说明,预测值与实际值的相对误差很小,足以满足造价估算的要求。
3) Cost estimate
![点击朗读](/dictall/images/read.gif)
造价估算
1.
This paper gives the fuzzy evaluation method of characteristic factors of project,establishes a cost estimate model based on information of real engineering materials and design documents of estimated project.
在工程项目建设的历史资料和设计资料基础上,通过对工程特征因素的模糊评价,充分利用其特征信息,建立了造价估算模型。
6) estimation
[英][,estɪ'meɪʃn] [美]['ɛstə'meʃən]
![点击朗读](/dictall/images/read.gif)
估计,估算,评价,估价,判断,测定估价
补充资料:风险估测
风险估测
【风险估测】运用概率及数理统计方法估测某一风险发生的概率及其损失后果的频率、性质和概率,以准确地估计损失的严重后果。或者说,风险估测就是运用概率统计方法对风险事件发生和风险事件的后果加以估测,从而给出一个较准确的概衣水平。风险估测包括对风险书件发生频率的估测和损失严重程度的估测。风险估测的具体内容有:第一,估测风险事件在确定时间内如一年(月、周)内发生的可能性即频率的大小;第二,根据风险事件发生的数量和损失的严重程度估计总损失额的大小。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条