1) flue gas of power plants
电厂尾气
1.
A novel dry gassolidsolid fluidized bed process was adopted for simultaneous high removal of SO2 and NO from flue gas of power plants combusting coal.
采用新型干法气固固流化床反应器进行模拟燃煤电厂尾气的高效同时脱硫、脱硝。
2) Refinery tail gas
炼厂尾气
3) tail gas of ammonia plant
氨厂尾气
4) refinery tail-gas
炼油厂尾气
5) ammonia plant tail gas
制氨厂尾气
1.
Presented is pressure swing adsorption using a home made catalyst PU1 for recovery of CO from ammonia plant tail gas.
制氨厂尾气含有大量CO ,若采用有效的分离、纯化工艺 ,可获得碳一化工 (C1 )所需的高纯度CO 。
6) Shanwei power plant
汕尾发电厂
1.
A runback test of unit is conducted in Shanwei power plant,and the test result is analyzed.
介绍了汕尾发电厂辅机故障减负荷(RB)试验的过程,并对试验结果进行了分析。
补充资料:IGCC电厂(见整体煤气化联合循环电厂)
IGCC电厂(见整体煤气化联合循环电厂)
Aintegrated gasification combined cycle plant
IGCC电厂bined eyele(integrated gasifieationConl一plant)见整体煤气化联合循环电厂。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条