1) blast furnace gas-burning heating and power station
煤气热电厂
1.
employing Honeywell Mi- cro TPS3000 distributed control system, of the boiler and steam turbine operated with the blast furnace gas-burning heating and power station at SISG.
介绍利用美国霍尼韦尔公司生产的 Micro TPS 3000集散控制系统实现韶钢高炉煤气热电厂锅炉和汽机的自动控制策略及控制过程。
3) thermopower plant by coal sludge
煤泥热电厂
4) coal gas power plant
煤气发电厂
1.
Probe into speed adjustment and energy saving of boiler s blower fan of steer enterprise and coal gas power plant;
钢铁企业煤气发电厂锅炉风机调速节能探讨
5) gas power plant
燃气发电厂,煤气发电厂
6) manufactured coal gas plant
煤制气厂
补充资料:北京石景山热电厂
北京石景山热电厂
《 }北京石景山热电厂《中国建设企业百强榜》
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条