1) mid-rise shear wall
中高剪力墙
1.
Experimental study on seismic behavior of mid-rise shear wall with concealed steel truss;
内藏钢桁架混凝土组合中高剪力墙抗震性能试验研究
2.
In order to calculate and understand the deformation and destruction process of the test specimens in theory,the elastoplastic finite element analysis of RC mid-rise shear wall with concealed bracings under lateral loading was carried out by ANSYS program based on experimental research.
为了从理论计算角度进一步了解带暗支撑中高剪力墙在水平荷载作用下的弹塑性变形与破坏过程,在试验研究的基础上,建立了钢筋混凝土带暗支撑中高剪力墙的弹塑性有限元分析模型,使用ANSYS有限元分析程序,对其在单调加载下的性能作了弹塑性分析,并分析了引起计算误差的原因。
3.
On the basis of experimental research on the seismic behavior of two one - third scale mod- els of mid-rise shear walls, the seis mic behaviors of two models were analyzed.
通过两个中高剪力墙模型的试验研究,比较分析了底部带暗支撑中高剪力墙与普通中高剪力墙的抗震性能。
2) high-rise shear wall
高剪力墙
1.
Experimental studies on seismic behavior of high-rise shear walls with concealed steel truss;
内藏钢桁架混凝土组合高剪力墙抗震性能试验研究
2.
Experimental study on seismic performance of high-rise shear wall with bi-directional single row of steel bars;
双向单排配筋混凝土高剪力墙抗震性能试验研究
3.
Seismic performance of high-rise shear wall with concealed truss
内藏桁架混凝土组合高剪力墙抗震性能
3) mid-rise shear wall with frame column
带边框柱中高剪力墙
4) high-rise shear
高层剪力墙
1.
The article introduces the design ideas and design process in energy-saving of a high-rise shear wall structure house project; design optimization and choosing of energy-saving materials and explains that the target of 50% energy-saving can be highly integrated with low cost investment.
文章介绍某高层剪力墙结构住宅项目工程节能设计设计思路和设计过程;节能材料设计优化和选择;说明实现节能50%目标与低成本投入能够高度统一。
5) tall wood shear walls
高木剪力墙
6) shear wall height
剪力墙高度
补充资料:剪力墙
剪力墙 shear wall 房屋或构筑物中主要承受风荷载或地震作用引起的水平荷载的墙体。防止结构剪切破坏。又称抗风墙或抗震墙、结构墙。分平面剪力墙和筒体剪力墙。平面剪力墙用于钢筋混凝土框架结构、升板结构、无梁楼盖体系中。为增加结构的刚度、强度及抗倒塌能力,在某些部位可现浇或预制装配钢筋混凝土剪力墙。现浇剪力墙与周边梁、柱同时浇筑,整体性好。筒体剪力墙用于高层建筑、高耸结构和悬吊结构中 ,由电梯间、楼梯间、设备及辅助用房的间隔墙围成,筒壁均为现浇钢筋混凝土墙体,其刚度和强度较平面剪力墙高可承受较大的水平荷载。 |
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条