说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 关键过程
1)  key process
关键过程
1.
To ensure the project quality, one has start with the process control, especially the control of key process.
要保证工程的质量就要从过程控制入手,特别是关键过程的控制。
2.
Study Methods: The key process of cellular LPBM was studied bymeans of comparison of the transition rate of.
方法:文献研究:通过总结细胞LPBM的实验研究,比较LPBM原初过程的跃迁速率方程和LPBM的剂量关系,研究LPBM的关键过程
3.
QCOS(Quality Check Operation Sheet)is a quality operating tool from General Motors for critical process control which could help to detect the defect during critical manufacturing process and decrease the risk of the occurrence of the defect(including safety,regulation,all the key process like torque,weld,equipment,operators that directly impact the customer satisfaction).
QCOS(Quality Check Operation Sheet)质量控制操作表,是来自GM系统用于关键过程控制的质量工具,它可以帮助我们检查在关键的制造过程存在的控制缺陷,降低出现缺陷的风险(包括涉及到安全项、法律法规项、直接影响到顾客满意度的扭矩、焊点、设备、人员操作等各种关键过程);通过QCOS系统地评估了一个控制过程,确定过程控制资源是否有效、合适,从而实现一个产品关键特性的质量过程保证。
2)  key processes
关键过程
1.
This article clearly discusses the logistic relations either pivotal process with key nature,important characteristic,key parts,important parts and key process by the terms and definitions of key processes,explores the differences between key processes and pivotal working procedure,explaines the activity between import and export of identifying of pivotal process,and activities related with them.
本文从关键过程及与其相关的术语和定义入手,明晰关健特性、重要特性、关键件、重要件与关键过程的逻辑关系,探讨关键过程与关键工序的差别,阐述了关键过程识别的输入、输出及与之相关的活动。
3)  process key point
过程关键点
4)  key process areas
关键过程域
1.
So this paper will use the attribute simplification and the rule of classification of rough set to analyze the key process areas of CMM and select the most suitable areas for the company.
本文将利用粗糙集中的属性约简和分类规则,对典型的软件企业优先实施的CMM2级中的关键过程域(Key Process Areas)进行分析,客观地找出最重要的部分过程域,为资源有限的企业在进行过程改进时需要优先进行的活动提供了指南。
5)  KPA
关键过程域
1.
The paper has braught forward the "Software Quality Control Framework(abbreviated to SQCF) based on CMM for the small or medium-size soft ware enterprises",The paper has also described the seven KPA of CMM which are the base of SQCF: Requirements Management,Software Project Planning,Software Project Tracing & Oversight,Software Quality Assuran.
提出了一个“基于CMM的面向中小软件企业的软件质量控制框架(SQCF)”,论述了构建SQCF的CMM中的7个关键过程域:需求管理、软件项目策划、软件项目跟踪和监督、软件质量保证、软件配置管理、软件产品工程和同行评审;给出了在SQCF中定义的必不可少的4个角色和3个组。
2.
The framework of CMM and the CMM sSQA KPA is firstly introduced.
介绍了CMM框架和CMM中的软件质量保证关键过程域,如何启动项目质量保证活动,如何实施项目质量保证活动,如何评审和监控项目质量保证活动以及如何对质量保证进行独立评估。
3.
The paper mainly explores how to implement some key process areas(KPA) of capability maturity model(CMM) by the Advantage family of products,so that the software development department can improve its maturity levels.
主要探索使用美国CA公司Advantage产品族来辅助实现成熟度等级中规定的一些关键过程域(KPA)的途径,以帮助软件开发单位提高其成熟度等级。
6)  key process area(KPA)
关键过程域
补充资料:正规过程和倒逆过程
      讨论完整晶体中声子-声子散射问题时,由于要求声子波矢为简约波矢(见布里渊区),所得到的总波矢守恒条件会相差一个倒易点阵矢量G)。例如对于三声子过程有下列条件
  
  
     , (1)
  式中q1和q2是散射前的声子简约波矢, q3为散射后声子波矢,式(1)中G)的取值应保证q3也是简约波矢。这时会出现两种过程,其一是当q1+q2在简约区内时,可以取倒易点阵矢量G)=0,式(1)则简化为总波矢守恒条件,称为正规过程或N过程。其二是当q1+q2超出简约区时,所取G)应保证q3仍落于简约区内,由于q3与q1+q2相差G),显然q3位于q1+q2的相反一侧,这时散射使声子传播方向发生了倒转,故称为倒逆过程或U过程。U过程总波矢不守恒,但总能量守恒,因为声子频率是倒易点阵的周期函数,而q3与q1+q2只相差一个倒易点阵矢量。N过程在低温长波声子的散射问题中起主要作用。当温度升高,简约区边界附近的声子有较多激发时,U过程变得十分显著,它对点阵热导有重要贡献。
  
  在能带电子与声子散射问题中存在着与式 (1)相仿的总波矢条件
  k+G=k┡±q,
  
     (2)
  式中k与k┡分别为散射前后电子的简约波矢,±号分别对应于吸收或发射q声子。类似的在热中子-声子散射以及晶体中一切波的相互作用过程中,总波矢变化都相差一个倒易点阵矢量G),因此也都有N与U过程之分。这是晶体和连续媒质不同之处,连续媒质对无穷小平移具有不变性,才能求得总波矢守恒,而晶体只具有对布喇菲点阵的平移不变性,因此总波矢守恒条件会相差一个倒易点阵矢量。
  

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条