说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 隧道口
1)  tunnel portal
隧道口
1.
Construction sequence and cost analysis of 24m double line box girders erected at tunnel portal by JQX900 bridging machine;
JQX900型导梁式架桥机隧道口架设24m双线整孔箱梁施工工序及成本分析
2.
Research purposes: The discussion is made in this paper on the influencing factors of landslide at tunnel portal and its treatment measure for the purpose of effect control of the landslide at tunnel portal.
研究目的:本文对隧道口滑坡的影响因素和处理措施进行探讨,解决有效控制滑坡体滑坡的处理措施。
3.
Discussions were made of a 32 m span, 900t girder carrying and erecting option in tunnel portal.
就隧道先期完工后 ,采用运架一体式架桥机吊梁穿越隧道 ,并进行隧道口 3 2m、90 0t预制混凝土箱梁的架设技术方案进行研讨。
2)  tunnel entrance
隧道口
1.
The principals for virescence design at tunnel entrance in overpass area of freeway should be carried on not only thinking about the basic theory of ecology resumption and the feasibility of engineering technique,but also paying attention to the engineering and ecology protection and the amalgamation relation among overpass area,tunnel entrance and surroundings.
高速公路立交区及隧道口绿化景观设计的原则,既要考虑生态恢复的基本理论和工程技术的可行性,还要注意实现具体的工程防护措施、生物防护措施以及立交区、隧道口与周围生态环境的融合。
3)  tunnel portal
隧道峒口
1.
Numerical simulation of exhaust gas convective diffusion from a tunnel portal;
隧道峒口废气对流扩散的数值研究
2.
Study on the controlling method of exhaust gas diffusion from a tunnel portal;
隧道峒口污染物扩散控制方案的研究
3.
According to air diffusion equation,it is a mathematic and physical model of pollutant diffusion for tunnel portal.
根据大气扩散方程建立公路隧道峒口污染物扩散的物理数学模型,并对某城市隧道峒口在冬、夏两季主导风向情况下CO扩散情况、浓度分布进行了数值模拟。
4)  Tunnel incision
隧道切口
1.
Analysis and treatment of complications of cataract extraction using interoperative and postoperative scleral tunnel incision in 712 eyes;
自闭式隧道切口白内障摘除术并发症分析与处理
5)  tunnel entrance
隧道洞口
1.
The practical method of tunnel entrance landscape design and its design procedure are presented in this paper.
提出了隧道洞口景观设计的实用方法及设计流程,并重点讨论了目前洞口景观设计的重要性和发展趋势;设计中如何采集洞口景观数据及如何利用洞口景观数据库;以及如何进行洞口景观点评价等在设计中应注意的几个问题。
2.
For ensuring the stabilization of slope around tunnel entrance, the tunnel design criterion gives out the definite demands to solpe gradient and excavating high, but these demands are confined only the sort of surrounding rock, can not judge the influence of layer property of surrounding rock and ground water.
为了保证隧道洞口边仰坡的稳定 ,隧道设计规范对刷坡坡率和开挖高度有一定的控制要求 ,但这种要求仅局限于围岩的类别 ,而对围岩的层理性状和地下水对坡体稳定性的影响不能作出判断。
3.
Research purposes:The construction of tunnel entrance is the key part of the whole engineering.
研究目的:隧道洞口段施工是整个隧道工程施工的关键。
6)  tunnel portal
隧道洞口
1.
Research purposes: Yichang-Wanzhou railway has 159 tunnels and 150 tunnel portals.
研究结论:隧道洞口发生滑坍除地质原因外,勘察资料不准确和不能及时进行方案完善是设计方面的主要原因,未按设计施工、未及时提出变更、施工方法不当、监控量测不及时是施工方面的主要原因。
2.
Because of the influence of the engineering geologic condition, hydrogeological condition and artificial factor, it is easy to have landslide at tunnel portal.
由于受工程地质条件、水文地质条件及人为因素等影响,隧道洞口施工过程中易发生洞口滑坡。
3.
This paper has studied a rockbolt-lattice strengthening technology and its functional mechanism and construction technology used in ahigh slope of the Xiaowang tunnel portal,this study presents that it s a good method to apply the rockbolt-lattice strengthening technology to strengthen thehigh slope of the tunnel portal.
针对肖王隧道洞口段高路堑边坡特点,通过稳定性分析,研究并提出了锚杆+格构加固技术在高边坡处治中应用的工作机理、施工技术及要点,研究表明,锚杆+格构加固技术在隧道洞口高边坡处治中取得了良好的应用效果,研究成果可供相关工程借鉴和参考。
补充资料:选择浇口位置的技巧入水口选择
浇口对制件的影响及位置的选择 
一、浇口位置的要求: 
1.外观要求 (浇口痕迹, 熔接线) 
2.产品功能要求 
3.模具加工要求 
4.产品的翘曲变形 
5.浇口容不容易去除 
二、对生产和功能的影响: 
1.流(Flow Length)决定射出压力,锁模力,以及产品填不填的满 
流长缩短可降低射出压力及锁模力 
2.浇口位置会影响保压压力 
保压压力大小 
保压压力否平衡 
将浇口远离产品未来受力位置(如轴承处)以避免残留应力 
浇口位置必须考虑排气,以避免积风发生不要将浇口放在产品较弱处或嵌入处,以避免偏位(Core Shaft) 
三、选择浇口位置的技巧 
1.将浇口放置于产品最厚处,从最厚处进浇可提供较佳的充填及保压效果。 
如果保压不足,较薄的区域会比较厚的区域更快凝固 
避免将浇口放在厚度突然变化处,以避免迟滞现象或是短射的发生 
2.可能的话,从产品中央进浇 
将浇口放置于产品中央可提供等长的流长 
流长的大小会影响所需的射出压力 
中央进浇使得各个方向的保压压力均匀,可避免不均匀的体积收缩 
3 澆口(Gate) 
澆口是一條橫切面面積細小的短槽,用以連接流道與模穴.橫切面面積所以要小,目的是要獲得 
以下效果: 
1.模穴注不久, 澆口即冷結. 
2.除水口簡易. 
3.除水口完畢,僅留下少許痕跡 
4.使多個模穴的填料較易控制. 
5.減少填料過多現象. 

1.3.1 設計澆口的方法並無硬性規定,大都是根據經驗而行,但有兩個基本要素須加以折衷考慮: 
1. 澆口的橫切面面積愈大愈好,而槽道之長度則愈短愈佳,以減少塑料通過時的壓力損失. 
2. 澆口須細窄,以便容易冷結及防止過量塑料倒流.故此澆口在流道中央,而它的橫切面 
應盡可能成圓形.不過, 澆口的開關通常是由模件的開關來決定的. 

1.3.2澆口尺寸 
澆口的尺寸可由橫切面積和澆口長度定出,下列因素可決定澆口最佳尺寸: 
1.膠料流動特性 
2.模件之厚薄 
3.注入模腔的膠料量 
4.熔解溫度 
5.工模溫度 

1.3.3 決定澆口位置時,應緊守下列原則 : 
1.注入模穴各部份的膠料應盡量平均. 
2.注入工模的膠料,在注料過程的各階段,都應保持統一而穩定的流動前線. 
3.應考慮可能出現焊痕,氣泡,凹穴,虛位,射膠不足及噴膠等情況. 
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条