1) Wuchiba tunnel
乌池坝隧道
1.
Analysis to gushing in Wuchiba tunnel and features of karstification;
沪蓉高速公路乌池坝隧道区岩溶发育特征及其涌水分析
2.
Wuchiba tunnel is the most important and most difficult project of Hurong West Expressway of Hubei Province.
乌池坝隧道是湖北沪蓉西高速公路项目的重点和难点工程,该项目主要是地质情况相当复杂,被列为一级高风险岩溶隧道,在施工有可能出现大的地质灾害和安全生产事故的发生,本文结合实际,介绍项目部在日常安全管理中的几个体系建设和应用。
3.
Wuchiba tunnel is a key project of Enshi to Lichuan section in HuRong expressway.
乌池坝隧道是沪蓉西高速公路恩施至利川段的控制性工程。
2) Gongba tunnel
拱坝隧道
4) Wushaoling tunnel
乌鞘岭隧道
1.
Experimental identification of the structure safety in the section of Silurian slate with sandwiched phyllite in Wushaoling Tunnel;
乌鞘岭隧道志留系板岩夹千枚岩地段结构验证试验研究
2.
Investigation and implementation of construction ventilation for an inclined shaft of Wushaoling tunnel;
乌鞘岭隧道斜井施工通风研究与实施
3.
Research on Parameters of Initial Support for Phyllite Stratum at Wushaoling Tunnel;
乌鞘岭隧道千枚岩地层初期支护参数研究
5) Wuxiaoling Tunnel
乌鞘岭隧道
1.
Construction scheme for Wuxiaoling Tunnel (1);
乌鞘岭隧道施工组织方案(上)
2.
Taking the construction of the left line (DK169+570~DK172+083) of Wuxiaoling Tunnel as the example, this paper introduces the application of TSP203, the latest tunnel geological advanced prediction system.
以乌鞘岭隧道左线(DK169+570~DK172+083)施工为例,介绍了最新的隧道地质超前预报系统TSP203技术的应用。
3.
Wuxiaoling tunnel during double tracking of lanzhou Wuwei section in Lanzhou Xinjiang Railway with a total length of 20.
乌鞘岭隧道位于兰新铁路兰州—武威段增建二线上 ,全长 2 0 。
6) Wuqiaoling tunnel
乌鞘岭隧道
1.
Key Measures for Mountain-crossing of Wuqiaoling Tunnel;
乌鞘岭隧道越岭攻关措施
2.
Problem of soft rock in NO.7 slanting shaft of Wuqiaoling tunnel and support technology;
乌鞘岭隧道7号斜井软岩问题及支护对策
3.
Wuqiaoling tunnel,the longest single-track railway tunnel in China,is the key project of Lanzhou— Urumchi Railway.
乌鞘岭隧道是兰新线重点控制工程,是国内最长的单线铁路隧道。
补充资料:西里乌坝
西里乌坝 |
Siriu Dam |
概 述 |
西里乌坝位于罗马尼亚南喀尔巴阡山布泽乌(Buzau)县布泽乌河(Buzau)上,距离最近的城市为内霍伊乌(Nehoiu)市。堆石坝,最大坝高122m,水库总库容1.55亿m3。水库面积4.18km2。工程于1985年竣工。 |