1.
A Study on Treatment and Collapse Mechanismanalysis of Speedway Tunnel in Wuzhuling;
乌竹岭隧道塌方事故原因分析和处治方法研究
2.
Systematic Study on Stability of Wuzhuling Tunnel Surrounding Rock Based on Artificial Intelligence and Three-dimensional Numerical Simulation
基于人工智能与三维数值模拟的乌竹岭隧道围岩稳定性系统研究
3.
Construction techniques of elastically bearing block solid bed for Wuxiaoling tunnel;
乌鞘岭隧道弹性支承块式整体道床施工技术
4.
A Study on Wushaoling Tunnel's Auxiliary Gallery Influence on Operation Ventilation and Long Tunnel Rescue Station Disaster Prevention Research
乌鞘岭隧道辅助坑道对运营通风的影响及特长隧道定点防灾研究
5.
The Safety Analysis of Wu Qiaoling Tunnel F_7 Fault Supports and Protections Structure;
乌鞘岭隧道F_7断层段支护结构安全性分析
6.
The Study of Control Technology for Large Deformation of Extruded Rock at Fault7 in Wushaoling Tunnel;
乌鞘岭特长隧道F7断层挤压大变形控制技术
7.
Durability Improvement of the Concrete Lining Structure of Wushaoling Tunnel
浅谈乌鞘岭隧道衬砌混凝土结构耐性的调整
8.
Applications of statistical analysis in the construction process of No.9 inclined shaft of Wuqiaoling Tunnel
统计分析在乌鞘岭隧道9号斜井施工中的应用
9.
Analysis of the statistics of the mechanical management of No.9 inclined shaft in Wuqiaoling tunnel
乌鞘岭隧道九号斜井机械管理统计分析
10.
Study on 3D Deformation Rule of Tunnel and the Application of the Rule to Wushaoling Tunnel;
隧道三维变形规律研究及其在乌鞘岭隧道工程中的应用
11.
Research on Construction Technique of Elastic Integrated Ballast of Tunnel in Wushaoling;
关于乌鞘岭隧道弹性整体道床设计结构施工工艺的研究
12.
Study of the Impact and Ountermeasure on the Environment during the Construction of the Wushaoling Railway Tunnel;
乌鞘岭隧道建设过程中的环境问题及其对策分析
13.
Tunnel Landslide Disposal--Taking Qinlingguan Tunnel as an Example
隧道塌方处理实例——以秦岭关隧道为例
14.
Study on the Construction Security Risk Identification of Highway Mountain Tunnel;
公路山岭隧道施工安全风险辨识研究
15.
Regulation and Prevention and Cure Methods to Groundwater in Mountain Tunnel;
山岭隧道地下水规律及防治方法研究
16.
Construction in Slip-form of Shaft No.2 in the Qinling Zhongnanshan Highway Tunnel
秦岭终南山公路隧道2#竖井滑模施工
17.
Tunneling Scheme for Bias Pressure Section of Right Line Tunnel Exist
桃墅岭隧道右线出口偏压段进洞方案
18.
Application of a "High Level Parallel Adit" in Jiazuqing Tunnel
高位平导在家竹箐隧道施工中的作用