1) maintenance optimization
检修优化
1.
This system uses star schema as structural model,takes basic parameters and operation information as data infrastructure,maintenance optimization and schedule as the core process,integer programming optimization model for the calculation of tool,and covers operation data management,maintenance optimization management,system management,and other functional modules.
针对当前发电机组检修管理系统在数据管理与分析能力上的不足,结合数据仓库技术多角度多层次、集成度高等优点,遵循电厂检修的实际要求,设计了基于数据仓库技术的机组检修决策支持系统,并采取星型数据仓库结构模型,以机组基本参数、运行维护信息为数据基础,以检修优化和计划安排为核心流程,以实用化的整数规划优化模型为计算工具,涵盖了运行数据管理、检修优化管理、系统管理等功能模块。
2) maintenance optimization
优化检修
1.
Idea of developing maintenance optimization in hydroelectric power plant;
水电厂开展优化检修的设想
2.
The development of condition-based maintenance(CBM) and maintenance optimization(MO) in Chinese thermal power plants in recent years are reviewed according to summing-up a great deal of papers published in China and research results of authors of this paper.
通过大量资料整理和总结作者研究结果,回顾了我国开展火电设备状态检修的历程,对近几年我国火电设备状态检修以及优化检修技术的发展进行评析,总结状态检修发展的情况和成就,阐述目前状态检修发展中的一些重要关系,指出存在的主要问题,探讨状态检修和优化检修实施的科学途径,展望今后的发展方向。
3) optimal maintenance
优化检修
1.
According to the needs for optimal maintenance of equipment in the power plant,the condition monitoring and diagnosis system of vacuum circuit breaker is studied.
结合大型电厂开展设备优化检修的需求,对真空断路器状态监测与诊断系统进行了研究。
4) optimized maintenance
优化检修
1.
Practice and realization of optimized maintenance;
电站优化检修的实践与认识
2.
Study and Application of Optimized Maintenance in Thermal Power Plant;
优化检修在火电厂的应用及探讨
3.
The article briefs the basic concept of optimized maintenance and main principles that Beilun power plant implemented in its maintenance practice.
介绍了优化检修的基本理念以及北仑发电厂在实施优化检修过程中的基本原则、具体措施以及取得的主要成果。
5) optimum maintenance
优化检修
1.
The suggested new technology may provide a scientific basis for optimum maintenance of fossilfired generating unit.
可靠性分析技术在电站主机和辅机状态检修中的应用,为火电机组优化检修提供了科学的依据。
6) maintenance majorization
优化检修
1.
Some maintenance majorization technology is given together with optimum repair patterns, optimum repair items, optimum time to planed repair and time to overhaul by equivalent operation hours.
给出了火力发电厂主设备的优化检修技术 ,内容涉及检修方式的优化、检修内容的优化和检修周期的优化。
2.
A mathematical model of maintenance majorization for large capacity fossil fired generating units of power station is pressented.
提出了大型火电机组优化检修的数学模型。
补充资料:发电系统检修计划优化
发电系统检修计划优化
optimization of gener-ating unit mainte-nance scheduling
fod一anx一tongJ旧nx一u]lhua youhuo发电系统检修计划优化(optimization ofgenerating unit maintenanee scheduling)发电系统中以系统可靠性或/和经济性为目标函数,并考虑实际中存在的约束条件后,对发电机组检修计划进行的安排。电力系统中由于发电机组检修使可用容t减小,对电力系统可靠性具有明显的影响。此外,电力部门每年用在机组检修的费用也非常庞大。因此,应该合理地安排检修计划。多年来不少研究人员从优化的角度进行了大t研究,已发表了多种优化检修计划的方法以适应系统发展规划和运行调度部门的偏要.这些方法大致可分为三类:①以系统备用容t作为判据的确定性方法,如等备用法;②以系统风险度作为判据的概率方法,如等风险度法.③以可靠性或/和经济性为目标函数的数学规划法。其中最常用的是等备用法和等风险度法。 等备用法安排检修计划时力求使全年内系统的备用容t接近相等,因此,目标函数为 △尸,“△几,i,j一1,…,t,…,T,i转j(1)式中△尸、为任一时段(如周、旬等)的系统净备用容量;T为一年划分的时段数。约束条件可分为三种:①时间约束,如机组一年的检修次数、持续时间、容许检修的期间等;②资源约束,如检修力量、主要器材及设备条件等;③环境约束,如水能利用情况、与电网检修的配合和用户负荷需量等因素。 等备用法由于简单直观易于实现,故自有电力系统以来沿用至今。但是,这种方法没有考虑机组和系统负荷的随机性质,因此,不能反映两个不同的系统即使具有相同的备用容量,可靠性也可能不同的情况。 等风险度法安排检修计划时力求使全年系统的风险度接近相等。因此,目标函数为 LOLE‘一LOLE,,i,]一1,…,t,…,T,i举少(2)式中LOLE,为任一时段的系统风险度(见发电系统可布性指标)。约束条件与等备用法相同。等风险度法应用检修机组的有效载荷容量(见发电机组有效载荷容1)代替它的额定容量来修正负荷曲线,各时段内变化的日负荷用发电系统等位负荷来代替,这些措施充分考虑了机组和系统可靠性的概率性质,克服了等备用法的缺点。因此,这种方法从20世纪70年代初期提出后,在电力部门(特别是规划设计部门)得到应用。 等备用法和等风险度法都可在计算机上实现,许多国家电力部门都研制有这方面的程序,一般都是用启发式方法进行优化。直接应用数学规划的优化方法(如整数规划法等),虽也见到了一些研究结果,但这种方法的局限性很大(如不易处理各种约束条件等),实际应用的很少。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条