说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 彩色混凝土生产
1)  colorful concrete
彩色混凝土生产
2)  colorized concrete
彩色混凝土
1.
Successful application of colorized concrete shotcrete rockbolt technique for protection provides a good choice in seeking a slope protection method that not only meet the engineering demand,but also beautifying environment.
在寻求既满足工程要求又能美化环境的山体边坡防护方法中,彩色混凝土锚喷防护技术的成功应用,给人们提供了选择。
3)  colored asphalt concrete
彩色沥青混凝土
1.
Taking colored asphalt concrete pavement construction at the bus stations along Highway Hefei-Paihe (one of the outlets of Hefei City), this paper expounds main performance characteristics of colored asphalt concrete pavement and approaches to the mix proportioning and construction quality control of colored asphalt concrete.
文章以合肥市出城口道路之一合派公路路面改造工程中两侧公交站点彩色沥青混凝土路面施工为例,简要阐述了彩色沥青混凝土路面的主要性能特点,并对其配合比设计与施工质量控制技术进行了探讨。
4)  colored building concrete
彩色建筑混凝土
5)  polished colored glass concrete
彩色玻璃混凝土
6)  colored finish concrete
彩色清水混凝土
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条