说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 龙口水利枢纽
1)  Longkou Water Control project
龙口水利枢纽
1.
The Demonstration on the Scale of Longkou Water Control Project;
龙口水利枢纽工程规模论证
2.
Quarry selection of concrete aggregate for the Longkou Water Control Project;
龙口水利枢纽工程混凝土骨料料源比选
2)  Longkou Water Project
龙口水利枢纽
1.
Design and optimization of Longkou Water Project;
龙口水利枢纽工程设计及优化
2.
It undertakes the construction task of main body of dam for Yellow River Longkou Water Project.
中国水利水电第四工程局作为我国水利水电工程施工总承包特级企业,在黄河龙口水利枢纽建设中承担了大坝主体工程的建设任务。
3)  Laoloukou water complex project
老龙口水利枢纽
1.
This paper introduces the engineering geology and construction period safety monitoring design for Laoloukou water complex project,and expounds the monitoring results during construction and analyses the deformation law and features of wall rock.
简单介绍了老龙口水利枢纽导流洞的工程地质概况及施工期安全监测设计,详细阐述了施工期安全监测成果,对围岩的变形规律及特征进行了深入的分析。
4)  Laolongkou Water Control Project
老龙口水利枢纽工程
1.
The sand-gravel material for filling the shell of the dam of Laolongkou Water Control Project is just from a gold-mining tailing,which has a greater specificity if compared with the natural materials for the grade-parameter.
龙口水利枢纽工程大坝坝壳填筑用砂砾料为采金弃料,该料在级配参数上与天然砂砾料有较大的特异性。
5)  Yellow River Longkou Water Conservancy Project
黄河龙口水利枢纽工程
1.
Yellow River Longkou Water Conservancy Project Gravel System High Slope Presplit Blasting Test and Application;
黄河龙口水利枢纽工程砂石系统高边坡预裂爆破试验及应用
6)  Longkou Water Control Project
龙口水利枢纽工程
1.
Temperature Control on Concrete Pouring of Longkou Water Control Project
龙口水利枢纽工程混凝土浇筑温度控制
补充资料:水利枢纽
水利枢纽
water control project;hydraulic complex

    为满足各项水利工程兴利除害的目标,在河流或渠道的适宜地段修建的不同类型水工建筑物的综合体。水利枢纽常以其形成的水库或主体工程——坝、水电站的名称来命名,如密云水库、罗贡坝、新安江水电站等;也有直接称水利枢纽的,如葛洲坝水利枢纽。水利枢纽按其承担的任务可分为防洪枢纽、水电站枢纽、灌溉枢纽、取水枢纽等。一个枢纽同时承担多项任务的,称为综合利用水利枢纽。水利枢纽还可按其所在地的地貌形态分为平原地区水利枢纽和山区(包括丘陵区)水利枢纽。枢纽中一般包括:挡水、泄水、取水以及某些专门性水工建筑物。合理安排这些建筑物之间的相关位置,使之达到技术上先进和可能、经济上合理、施工期短、运行可靠、便于管理和维修,称为枢纽布置。枢纽布置需要通过论证比较,确定最佳方案。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条