1) Time limit accounting
工期核算
3) labor cost calculation
人工核算
4) engineering account
工程核算
5) computation of working time
工期计算
1.
In this article,according to many years pedagogic experience,the author summarizes the ways on computation of working time and drawing of gradation plan calendar multi-story running construction with different paces.
介绍了多个施工层异步距异节拍流水施工的工期计算及进度计划表的绘制方法。
6) calculated project duration
计算工期
1.
According to a bar chart and activity-on-arrow network in different building parts construction, the different calculated project durations between flow process plan and network plan are introduced and their differences are presented in essence.
分别用流水进度计划中横道图的方法与网络计划中双代号网络图的方法安排分段施工的进度计划 ,得出不同的计算工期 ,揭示出流水进度计划和网络计划安排进度计划的实质差异 ,然后提出流水网络计划使得流水进度计划与网络计划达到统
补充资料:矿产资源核算与国民经济核算
矿产资源核算与国民经济核算
mineral resources accounts on the system of national accounts
kuangehan ziyuan hesuan yu guominjingJ一hesuan矿产资源核算与国民经济核算(而ne耐resouI’cesac-eounts on the叮stem of national accounts)在国民经济核算体系中建立与矿产资源核算的关系。在国民经济核算体系中反映矿产资源的各种经济数量状况:①把矿产资源勘查部门、矿产资源所有者和矿产资源使用者都列人机构部门,分别归人不同核算范围;②将矿产资源列人资产范围,属于非金融非生产资产;③将矿产资源勘查列人固定资本形成总额。由此即可进人国民经济核算体系的国内生产总值核算、投人产出核算、资源流量核算、资产负债核算中。 中国在1992年颁布实施新国民经济核算体系。联合国等有关组织1993年发表的《1993年版国民经济核算体系》中都有矿产资源核算内容。这标志着矿产资源核算与国民经济核算体系建立了初步联系。矿产资源核算与国民经济核算体系的关系还需要不断改进和完善。(何贤杰纪方)
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条