说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 上承式移动模架
1)  deck mobile formwork carrier
上承式移动模架
1.
Introduced hereby are the features, assembly and erection of the deck mobile formwork carrier adopted in the works, precompaction test, adjustment of the precamber of the main girder and the operation flow, with a summary of the engineering features and measures for assurance of construction safety and quality.
温福铁路鳌江大桥工程双线简支箱梁采用上承式移动模架施工,效果良好。
2)  upstroke moving carrier
上行式移动模架
1.
The beam making construction technique of DSZ32 m/900 t upstroke moving carrier;
DSZ32m/900t上行式移动模架制梁施工技术
3)  under-deck movable shuttering form
下行式移动模架
1.
Taking the assembling of the 40 m long under-deck movable shuttering form used for the simply-supported railway box girders on piers No.
以武汉天兴洲公铁两用长江大桥正桥Ⅰ标段0~022号墩铁路简支箱梁40 m下行式移动模架拼装为例,对移动模架支架法拼装、主梁预拱度控制、主梁轴线控制及荷载预压试验等进行叙述,为今后同类型移动模架拼装提供参考。
2.
0~022 of Contract I of the Main Bridge,Wuhan Tianxingzhou Changjiang River Rail-cum-Road Bridge were constructed by the 40 m long under-deck movable shuttering form.
武汉天兴洲公铁两用长江大桥正桥Ⅰ标段0~022号宽墩铁路简支箱梁采用40 m下行式移动模架施工。
4)  self-propelled travelling die carrier
自行式移动模架
1.
Research purposes:Application of key technologies and techniques of self-propelled travelling die carrier casts the long span and large tonnage box beam in place for passenger dedicated line for the purpose of meeting the requirements of rapid construction the bridge of passenger dedicated line.
研究目的:解决自行式移动模架法现浇客运专线铁路大跨度、大吨位箱梁的关键施工技术、施工工艺,以适应客运专线桥梁的快速施工。
5)  deck truss
上承式桁架
6)  movable shuttering form
移动模架
1.
The piers of the Bridge are of single-and double-column piers without capping beams and the concrete continuous box girders atop the piers are constructed by movable shuttering form.
富溪12号公路桥位于蜿蜒峡谷中,设计曲线半径550 m,桥墩为单、双无盖梁柱式墩,混凝土连续箱梁采用移动模架施工。
2.
This paper presents the method for construction of the superstructure of the north approach spans of Huangpu Bridge over Zhujiang River in Guangzhou by movable shuttering form under special construction conditions and also the key control points and safety protection measures for construction of long span prestressed concrete box girders by the form.
介绍特殊条件下利用移动模架施工广州珠江黄埔大桥北引桥上部结构的施工方法,采用移动模架施工大跨度预应力混凝土箱梁的关键控制点及安全防护措施。
补充资料:PRO/E模架库安装方法
选择要安装的模架库,指明安装路径如D:\PTC,开始安装。
 安装完后进入D:\PTC\moldlib\bin\i486_nt(或95)下,运行mkmoldconfig.exe,
 敲上模架库路径D:\PTC,产生"config.pro"文件,这时就将这个文件里的内容
 合并到您的"config.pro"文件里就行了,模架库就可挂上了。
 再在您的"config.pro"文件里设置:search_path D:\PTC\moldlib\
 search_path_file D:\PTC\moldlib\bin\i486_nt\config.pro
 模架库就挂上了。
 在您的"config.pro"文件里设置:menu_translation both就可以中英文并存了。
 模架库启动方法:
 启动PROE,新建Assembly里的Design,产生asm0001.prt文件,再打开上边Applications
 下拉菜单
 中的mold layout,右边菜单选第二项Mold Base,再选ADD,选择合适模架就行了
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条