This paper introduces main problems in the operation of the slag cooler of 300 MW CFB boilers in Qinghuangdao Power Generation Co.
介绍了秦皇岛300 MW CFB锅炉冷渣器运行中出现的主要问题及改造经过。
2.
Cold state test for classifying coarse and fine particles in the fluidized slag cooler under diffierent superficial velocities has been carried out.
对流化床冷渣器分选器中的粗细物料分选机理进行了冷态试验,结果表明:当分选器内的表观速度达到细颗粒的终端速度后,细颗粒被大量扬析出分选器,而粗颗粒的夹带高度有限,从而实现粗细颗粒的分选;分选器的表观速度和稀相区物料浓度同时影响粗颗粒的夹带高度;分选器采取上大下小的扩径结构,可以在不降低表观速度的条件下降低粗颗粒的夹带高度。
3.
Structure and characteristics along with application modes about general air/water cooled slag cooler of ner type 300 MW CFB boiler were introduced,and some suggestions of the author were given about problems in its application.
介绍了新型300 MW循环流化床锅炉通用的风水联合冷渣器的结构、特点及应用方式,并对其应用中的一些问题提出了自己的见解。
2)  ash cooler
冷渣器
1.
Operation Problems of Ash Cooler of CFB Boiler and it s Improvement Measures;
循环流化床锅炉冷渣器运行问题及改进措施
2.
On the basis of long-time study and research,one new type ash cooler installed in the primary air windbox or the primary air duct is introduced in this paper.
目前,循环流化床锅炉底渣冷却越来越成为此种锅炉长期安全稳定和经济运行的制约因素,经过长期的探索和总结,提出一种安装在锅炉一次风室或一次风道内的装置,用锅炉燃烧一次风来冷却底渣的方法,并从冷却、分离和磨损等方面阐述了该新型冷渣器的可行性,分析对比了该新型冷渣器的优点,以供参考。
3.
This paper briefly describes the working conditions and operation experiences of ash cooler.
简要分析冷渣器运行时的各种工况以及实际运行过程中的经验体会。
3)  bottom ash cooler
冷渣器
1.
Experimental Study on bottom ash coolers in CFB boiler;
CFB锅炉流化床冷渣器试验研究
2.
The structure characteristics and application effects of several typical fluidized bed bottom ash coolers are analyzed in this paper, and the influence of structures and operation parameters on the performance of bottom ash coolers is discussed emphatically.
分析了国内常用的几种流化床冷渣器的结构特点及其使用效果,重点讨论了冷渣器结构和运行参数对冷渣器性能的影响。
3.
The thesis introduces the problems, reasons and transformations appeared to operate the bottom ash cooler of the 100 MW CFBB in initial stage in Jiangxi Fenyi Power Plant.
对江西分宜发电厂100MW循环流化床(CFB)锅炉冷渣器运行初期出现的问题、原因及改造进行了介绍。
4)  cooling-dreger bed pressure
冷渣器床压
5)  cooling-dreger bed temperatune
冷渣器床温
6)  buttom ash cooler
排灰冷渣器
1.
According to some problems arisen in the operation of 100MW circulating fluidize bed boiler selective buttom ash coolers,this paper summarizes the reason to give rise to trouble,and gives improvement measure,and points out should strengthen supervision of operating parameters.
结合某电厂100MW循环流化床锅炉选择性排灰冷渣器运行中出现的问题,总结了产生故障的原因,提出了相应的改进措施,指出了运行中应加强的几个监控运行参数。