1) value of arch
拱度值
2) camber
[英]['kæmbə(r)] [美]['kæmbɚ]
拱度
1.
This article introduces the author how to use cable sling, height gauge together with water level to measure girder s camber of bridge crane, and expatiates the operation process in detail.
简介了笔者用水准仪结合吊钩挂放吊尺测量桥式起重机主梁拱度的探索过程,详细介绍了此法的具体操作步骤,并对此法在测拱过程中的诸多技术性问题及测量结果的准确度进行了比较深入的讨论与论证。
2.
In order to solve the problem that the prefabricated camber size of main girder\'s web plate on aluminum electrolysis multifunctional unit is too big or small,resulting in climbing or gliding problem of tapping trolley and tool trolley during production.
针对铝电解多功能机组主梁腹板预制拱度过大或过小、导致生产中出铝小车和工具小车运行时发生爬坡或下滑的问题,根据由理论计算的主梁跨中静挠度值以及与主梁焊接时引起拱度值变化的实际经验,给出确定主梁腹板预制拱度的一种方法,此方法解决了生产实际中出现的问题。
3.
Girder camber is a important technical condition of Pot Tending Machine(PTM),dimensions of girder camber affects directly run of tool car and Aluminum car.
主梁拱度是铝电解多功能机组一个重要的技术条件,主梁拱度的大小直接影响到工具小车和副小车的运行,在主梁的制造过程中,要合理的安排组装顺序、焊接顺序,并采用特殊工艺进行焊后修复,以保证主梁拱度的技术要求。
3) Arch Camber
拱度
1.
Based on the study of relevant standards and literatures and the inspection practice performed on 100 cranes,some knowledge of the rigidity and arch camber of the main beam of gantry cranes is introduced,and herefrom some new ideas about the repair and design of main beams are proposed.
根据对标准和文献的研究、以及100台起重机检测的实践,阐述了对门、桥式起重机主粱刚度和拱度的认识,并且据此提出了关于主梁拱度修理的新工艺和与拱度有关主梁的设计思想。
4) inverted arch value
反拱值
1.
This article introduced the construction technology of bonded post-prestressed for a certain long-span beam,analyzed the construction difficulties and key points,and elaborated the construction process,prestress tension,tension control and measurement of inverted arch value to ensure the overall quality of the prestressed structure.
本文介绍某工程大跨度梁有粘结后张法预应力施工技术,分析预应力梁施工中的控制难点和要点,详细阐述预应力施工工艺流程、预应力张拉、张拉控制以及反拱值的测量等,以确保预应力混凝土结构的总体质量。
5) rising value of arch
起拱值
1.
Through those technology measures some quality problems are solved as breakage in beam end, side bending, large rising value of arch, difficult control of tension and extension value and blockage of pipe and some good efficiencies are acquired.
介绍了在公路桥梁工程中预应力混凝土Ⅰ型梁预制时对模板的制作、钢筋骨架的安装、混凝土浇筑、张拉及灌浆过程中采取的一些技术措施 ,解决了梁端齿块破损、侧向弯曲、起拱值偏大、张拉伸长值难以控制及孔道堵塞等一些质量问题 ,并取得了较好的效
6) bulging height
起拱高度
1.
A regression equation indicating the relation between the fabric bulging height and weight, and between the fabric weight and compactness is derived from the test and analysis of the bulging height of heavy_weight silk fabrics conducted by self_made bulge tester, thus offering data support to the design of proper weight and compactness of the fabric for bulge proofness.
采用自制的起拱测试装置 ,对重磅真丝绸的起拱高度进行了测试和分析 ,得出了重磅真丝绸的起拱高度与织物重量 ,织物重量与织物紧度间的回归关系式 ,为重磅真丝绸抗起拱性的适合重量和紧度设计提供了数据支持。
补充资料:幅值裕度
分子式:
CAS号:
性质:相角交界频率ωL(即开环频率特性相角ψ(ωL)=-180°时的频率)上。开环频率特性幅值。
CAS号:
性质:相角交界频率ωL(即开环频率特性相角ψ(ωL)=-180°时的频率)上。开环频率特性幅值。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条