1.
This paper presents the structure of the scaffold, as well as setting precamber and decentering techniques.
对该支撑拱架的结构、预留拱度设置、拱架卸落等进行了介绍。
2.
an arch whose jambs are not at right angles with the face.
拱的侧板与拱的正面搭配角度不对的拱。
3.
a arch whose height is less than half its width.
高度不及宽度一半的拱。
4.
Comprehensive optimization of joint closure temperature field and its shape for arch dam
拱坝封拱温度场及体形综合优化方法
5.
The arch has a span of 60 meters.
拱门的跨度为60 米。
6.
The arch has a span of 60 metres.
那个拱的跨度为60米.
7.
Calculation of stayed buckle cable forces for concrete filled steel tubular arch bridge with long span in process of lifting
大跨度钢管砼拱桥拱肋吊装中的扣索索力计算
8.
OPTIMIZATION OF STAYED-BUCKLE CABLE FORCES DURING ADJUSTMENT OFTHE LINE-SHAPE ON LONG SPANARCH BRIDGE
大跨度拱桥拱肋线形调整中的扣索索力优化
9.
Simulation Calculation of Arch Rib Hanging Construction and Aseismic Analysis of Large Span Arch Bridges;
大跨度拱桥拱肋吊装仿真计算与抗震分析
10.
Preprocessing of Monitoring Deflection Data on the Main Arch Ring with High Differential Elevation
拱桥大高差主拱圈挠度监测数据预处理
11.
Study on Arch Structure Optimization of Long-span CFST Arch Bridge
大跨度多肢钢管混凝土拱桥主拱构造优化研究
12.
Construction Technique of Arch Rib in Pushan Long Span Concrete-infilled Steel Tube Arch Bridge
大跨度钢管混凝土拱桥拱肋施工技术研究
13.
The stability analysis of large span steel light arcuated arch frame construction stage
大跨度钢质轻型拱式拱架施工阶段稳定性分析
14.
Study of Local Stress in Arch Seat of Long Span Concrete-Filled Steel Tube Arch Bridge
大跨度钢管混凝土拱桥拱座局部应力研究
15.
Linear Control Techniques for the Arch Ribs in Large-span Steel-pipe Concrete Arch Bridge
大跨度钢管混凝土拱桥拱肋线形控制技术
16.
Computation of the Temperature Field and the Temperature Load in Arch Dams Ⅱ
拱坝温度场和温度荷载的计算(Ⅱ)
17.
Effect of Temperature Change on Abutment Stability of Arch Dam
温度荷载对拱坝坝肩稳定影响的探讨
18.
Travelling Wave Seismic Response of Long Span Arch Bridges
大跨度拱桥在地震行波作用下的响应