说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 双轴向疲劳载荷
1)  biaxial fatigue loading
双轴向疲劳载荷
1.
Under biaxial fatigue loading, a mode I crack of specimens for 16MnR, 45~# or 1Cr18Ni9Ti steels bifurcates quickly into two symmetric branch cracks.
双轴向疲劳载荷作用下,16MnR、45~#及1Cr18Ni9Ti钢试件的Ⅱ型裂纹快速分支转型。
2)  fatigue load
疲劳载荷
1.
Simulation of torsion fatigue load spectrum of automobile transmission system;
货车传动系统扭转疲劳载荷仿真
2.
Probability model of fatigue loading for submarines and submersibles;
潜艇疲劳载荷的概率模型
3.
The effect of fatigue load on the lumbar disc morphology after disectomy:a pig model
猪腰椎间盘髓核摘除术后疲劳载荷对椎间盘形态的影响
3)  fatigue loading
疲劳载荷
1.
According to the working conditions of the crane for iron & steel works,which are as follows: the working level of the crane is A7 or A8;full load operation;the travel position of the bogie is fixed;and the stress is constant amplitude,consequently,the life estimation model,fatigue loading spectrum and computing parameters are confirmed.
针对冶金起重机工作的级别为A7或A8、满载工作、小车移动位置固定、应力等幅等条件,确定了寿命估算模型、疲劳载荷谱以及计算参数。
2.
The performance of concrete under fatigue loading is easily deteriorated due to long-time eroding,which badly influences the service life of the concrete structure.
针对混凝土损伤发展的第二阶段,采用不同疲劳循环寿命比对应的残余拉应变和疲劳破坏时,极限残余拉应变的比值定义损伤变量,据此研究了疲劳载荷与氯离子协同作用下,对基准混凝土和钢纤维混凝土耐久性的影响。
3.
The performance of concrete under fatigue loading is easily deteriorated due to long-time eroding,which badly influences the service life of concrete structure.
针对混凝土损伤发展的第Ⅱ阶段,采用残余拉应变来表征损伤变量,研究了疲劳载荷与氯离子协同作用下对高性能混凝土(HPC)和高性能纤维混凝土(HPFRCC)耐久性的影响。
4)  fatigue loading
疲劳荷载
1.
Simply supported concrete beams loaded by equal amplitude fatigue loading were studied.
对配有不同配筋率的冷轧带肋钢筋混凝土简支标准梁(550mm×150mm×150mm)进行了等幅疲劳荷载试验研究,试件配筋率分别为0%、0。
2.
It is the fatigue loading, not the design loading at the worst cases that should be considered for evaluating existing bridges and new bridge fatigue design.
新桥疲劳设计和既有桥梁评估应采用疲劳荷载。
5)  fatigue load
疲劳荷载
1.
The crack of high-strength reinforced concrete beam under fatigue load and its rigid calculation;
疲劳荷载下高强钢筋混凝土梁裂缝和刚度计算
2.
Deflection of a composite steel-concrete beam subjected to a fatigue load
钢-混凝土组合梁在疲劳荷载作用下的变形计算
6)  fatigue loads
疲劳载荷
1.
The shear stress of the main shaft of a 300 t converter vessel at blowing as an example, by analyzing the statistics characters of its amplitude and mean value, an average treatment method for the random fatigue loads is presented in this paper, and the Monte Carlo method is used to simulate the average loads.
以 30 0 t转炉吹炼时耳轴的实测切应力为例 ,通过分析载荷幅值和均值的统计特性 ,提出了一种随机疲劳载荷的平均处理方法 ,并使用 Monte Carlo法实现了平均载荷的再
2.
How to deal with fatigue loads of main mechanism of wind turbine is always an important problem for designers and manufacturers.
结合国外风力发电机组检测认证的项目内容,本文选取了主要参数中的疲劳载荷构建了风力发电机组的疲劳载荷测试系统,重点是对风力发电机叶片和塔架做了疲劳载荷分析和寿命预测。
补充资料:浅谈“收缩包装设备”单轴与双轴的选择

收缩包装和其它主流包装设备一样,有间歇式和连续式两种可供选择。在激烈的市场竞争下,零售商的要求又越来越苛刻,包装质量至关重要,这一切激发了对收缩包装设备的又一轮争论。


    一方面来说,双轴(间歇式)设备的供应商在市场份额上占主流;另一方面,中等速度的单轴(连续式)设备也在不断对市场形成冲击。


    Yorkshire Packaging Systems公司(YPS)向客户推出了单轴设备,但据销售总监Glyn Johnson说,目前整个包装业还是双轴设备的市场。
                          


    Johnson认为,双轴设备仍然占有80%-90%的市场。在这个金字塔结构中,高速设备在顶部,中速设备在中部,下面是单轴设备,最下面是大量的双轴设备。


    就如Johnson所说,“单轴设备速度上有优势,薄膜定位的控制上更精确。”他同时指出,高速单轴设备的运行成本是双轴设备的8-10倍。



     Aetna公司主席Barry Tucker认为,市场“被分割成两条路”。现有的双轴系统用户在更新换代时,包装速度在每分钟20包左右的用户中,75%左右会将单轴设备列入考虑范围。


    “至于每分钟超过20-25包的用户,大多数人会决定采用单轴设备。”他说,“目前市场上已经出现了经济型的单轴系统,总体成本略低于性能较好的双轴系统。”


    价格下跌


    Tucker先生说,最近几年单轴设备的价格有所下降,几乎接近生产成本。目前随着世界钢材价格上涨,可能会有所上调。


    他指出,目前手动喂料、速度在10-15包/分钟左右的双轴设备价格已经接近底线,但对于食品饮料生产商,他们的设备是能够自动喂料的,在这一领域,双轴设备的优势并不明显。


    Barry Tucker对单轴设备的效率大大高于双轴设备这一说法表示质疑。他指出,双轴设备在计算速度时必须把托盘装载的时间包括在内,而单轴设备都在在线完成的,这两者之间有很大的区别。


    Europack同时生产单轴和双轴设备,但他们看好的是双轴的市场。


    事实上,该公司的销售总监Ivan Reeve把双轴设备和单轴设备的销售比例定在3∶1。他说,在20-30包/分钟的领域,两种技术差距比较大,但市场主要还是集中在最常见的5包/分钟领域。


说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条