说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 避暗穿梭实验
1)  avoiding dark going through crooked road experiment
避暗穿梭实验
2)  step-through task
避暗实验
1.
The number of error and the length of latency were recorded one day,two days,three days and five days after the drug administration in the step-down and step-through tasks.
用跳台实验和避暗实验分别测定用药后1、2、3、5天的错误次数和潜伏期。
2.
The latency and error numbers of in each group were observed by the step-through task.
用避暗实验(step-through test)分别观察24 h后记录小鼠的潜伏期和错误次数。
3)  step-through test
避暗实验
1.
Step-down test and step-through test were conducted to evaluate the effects of propofol on learning and memory function.
用跳台实验(step-downtest)和避暗实验中(step-through test)分别观察、比较小鼠潜伏期(latency)和错误次数(number of errors),以评估药物对小鼠的学习记忆功能的影响。
2.
After 14d administration of AST,t he abilities of learning and memory of mice were investigated by step-down test and step-through test in all animals.
kg-1)组,术后连续ig给药21 d,末次给药后1 h,采用跳台实验和避暗实验观察各组小鼠的学习记忆功能;取胸腺和脾脏计算脏器指数;化学比色法检测脑组织MDA、NO含量和SOD、NOS活性。
3.
7 days later,step-through tests were conducted on mice in both groups.
7天后,对2组小鼠进行避暗实验,记录、比较停止熏染后0h、24h、48h各组小鼠的潜伏期和错误次数。
4)  step through test
避暗实验
1.
3 ml·kg-1)respectively in mice before intracerebroventricular injection of different doses of NMDA(25,50,75 ng),then the error times,step down latency and step through latency were observed in the step down test and step through test.
kg-1)建立遗忘模型,在跳台实验和避暗实验中分别观察不同剂量NMDA(25、50、75ng)侧脑室注射(intracerebroventricular injection,icv)对遗忘小鼠错误次数(error times,ETs)、跳台潜伏期(step down latency,SDL)、步入潜伏期(step through latency,STL)的影响。
2.
Methods Amnestic model was established by intraperitoneal injection of etomidate(3 mg·kg-1) in mice before intracerebroventricular injection of different doses of bicuculline or NMDA,then the error times,step down latency and step through latency were observed and recorded in the step down test and step through test.
kg-1),建立遗忘模型,在跳台实验和避暗实验中分别观察不同剂量的荷包牡丹碱或NMDA侧脑室注射对遗忘小鼠错误次数(error times,ET)、跳台潜伏期(step down la-tency,SDL)、步入潜伏期(step through latency,STL)的影响。
5)  shuttle box test
穿梭箱实验
6)  dark avoidance task
避暗回避实验
补充资料:保险商实验室安全标准(见保险商实验室)


保险商实验室安全标准(见保险商实验室)
safety standards of UL: see Underwriters Laboratories; UL

  Baoxianshang Sh啊nshi anquan bicozhun保险商实验室安全标准(saJ七ty stand助dsofUL)见保险商实脸室。
  
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条