说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 积分制
1)  Integral system
积分制
1.
In this essay,the evaluation method of the integral system,which is for the project of scientific research in education,is put forward and put into practice according to the basic principal of the item management and the process design management.
文章根据项目管理和流程管理的基本原理,提出了教育科研课题积分制评价方法并将其运用于实践。
2)  integral control
积分控制
1.
New precise measurement of long-length base on integral control;
一种基于积分控制的大长度精密测量的新方法
2.
A method of trajectory-tracking based on integral control realized by 2-step input-output linearization for a laboratory 3 degrees of freedom(3-DOF) helicopter model is introduced.
基于该仿真平台,将线性化系统分解成两个子系统,定义输出为输出误差积分以实现积分控制,按照输入-输出线性化方法通过坐标变换和输入变换对其线性化模型全状态精确线性化,实现了系统完全解耦,对扩展系统按照线性LQR方法设计跟踪控制器。
3.
On a basis of the plug-in repetitive control method in the 110V,50Hz online UPS,the application of Proportional control and integral control accelerate the adjustive process,and improve the static characteristic.
在嵌入式重复控制方案的基础上,加入比例、积分控制,用于110V,50Hz不间断电源(UPS)的逆变环节,加速了调节过程,改善了系统静态特性。
3)  Restrained Integration
积分抑制
1.
Parameters Self-Turning Fuzzy Controller with Restrained Integration;
具有积分抑制的参数自整定模糊控制
4)  accumulation scores regulation
积分制度
5)  control volume integration
控制容积积分
6)  control volume integral method
控制容积积分法
1.
A control volume integral method appearing in the SIMPLE is adopted here for the first time.
首次运用类似 SIMPL E方法的控制容积积分法的思想 ,对层流预混平面火焰控制方程的各项分类处理 ,对源项线性处理。
补充资料:JIT准时制生产(及时制生产)

JIT准时制生产(及时制生产):是应用拉引式生产物流控制原理的方法。在生产系统中任何两个相邻工序即上下工序之间都是供需关系,如何处理这种关系,就是生产物流所要研究的问题。按照传统的生产计划组织生产(包括MRP),物料根据预定的计划时间由供方向需方逐个工序流动。需求方根据上一工序送来物料的数量和到达时间进一步加工。需求方接受物料完全是被动的,如果出现不可预料的因素,物料可能提前或延迟到达。延迟到达将使生产中断,必须在生产计划中留有余地,以避免这种现象的发生。这样一来,必然存在或多或少、提前到达的现象,从而导致系统中库存量的上升,产生种种库存多余的弊病。JIT的方法改变了传统的思路,由需方起主导作用,需方决定供应物料的品种、数量、到达时间和地点。供方只能按需方的指令(一般用看板)供应物料。送到的物料必须保证质量,无残次品。这种思想就是以需定供,可以大大提高工作效率与经济效益。

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条