1) Track equipment
有轨设备
2) trackless equipments
无轨设备
1.
The running of the small trackless equipments in 753 project are expounded.
介绍了小型无轨设备在753工程的应用情况;阐述了提高无轨设备生产率的途径。
2.
The test running of the small trackless equipments in tunneling at 753 Mine is described.
介绍小型无轨设备在规模较小的753矿巷道掘进中的试验应用情况。
3) trackless equipment
无轨设备
1.
On the management model of trackless equipment;
无轨设备管理模式的探讨
2.
Combined with the operation situation of underground large trackless equipment in Jinchuan N0.
结合金川二矿区井下大型无轨设备的使用情况,介绍了液压系统的故障成因及诊断方法,并在实践的基础上,具体阐述了设备故障的查找方法与处理措施。
3.
Aimed at the characteristics of Dahongshan Deposit such as high temperature in deep depth, gently inclined ore bed, medium thickness of seam and multi - layer, the large - scale trackless equipment is applied to reduce mining - cut ratio, increase production capacity, reduce operating cycle, and reduce the dilution and loss of ore.
针对大红山矿深部高温缓倾斜中厚多层的矿体特点,立足引进大型无轨设备,在总结一期生产的基础上,以降低采切比、提高采场生产能力、缩短回采周期、降低损失贫化率为出发点,提出大红山二期采矿方法的思路。
4) shunt equipment
转轨设备
1.
The locomotive signal shunt equipment is the key installation to determine safety running and efficient transportation of a train.
机车信号转轨设备决定列车运行安全和运输效率的关键设备,衡量一套完整机车信号监控设备主要技术指标就是列车运行安全和运输效率。
5) track facility
轨道设备
6) wayside equipment
轨旁设备
1.
This paper introduces the design of propulsion & power supply system for Shanghai Maglev transrapid project,including the choice of power supply,the load caculation,the layout of 110kV & propulsion substation as well as the wayside equipment.
简要叙述了世界首条进行商业运营的磁浮列车线-上海磁浮快速列车示范运营线的牵引供配电系统的设计 ,包括供电电源的确定、负荷的组成 ,变电所的布置和轨旁设备的组成等。
补充资料:轨轨
1.依循轨迹。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条