In order to guarantee the engineering quality of coking furnace, some measurements should be taken to control the line size of coking furnace and datum mark,and to check up the ver-ticality and leveling, and to clean the expand gap of the coking furnace shaft hole, and to ensure saturation of mortar paste, and etc.
在焦炉炉体砌筑施工中,应注意焦炉线尺寸、标高的控制及垂直度、平整度的检查,焦炉炉体孔道膨胀的清洁,灰浆是否饱满等问题,采取措施及时处理,确保焦炉工程质量。
4) coke oven equipment
焦炉设备
1.
,Ltd and details the reformation method of lining body of coke over and briefly explicates the design improvement from some ways of coke oven equipment,drying oven method,instrument and automation control process,etc.
介绍了莱钢焦化厂 3#焦炉的设计 ,详细阐述了焦炉砌体的改进 ,并简要说明焦炉设备、烘炉方法、仪表与自动化控制等几个方面的设计改