2) monolithic prestressing
整体预应力
1.
Slab-column structure assembled by monolithic prestressing is a type of structure system in which prefabricated reinforced concrete slabs and columns are main members bearing load.
装配式整体预应力板柱结构是采用预制的钢筋混凝土楼板和柱作为主要的受力构件,通过整体张拉预应力钢筋而形成的板柱结构体系。
2.
Slab-column structure assembled by monolithic prestressing is a type ofstructure system in which prefabricated reinforced concrete slabs and columns aremain members bearing load.
装配式整体预应力板柱结构是采用预制的钢筋混凝土楼板和柱作为主要受力构件,通过整体张拉预应力钢索而形成的板柱结构体系。
3) overall selfstress modes
整体自应力模态
1.
A new method which can determine the overall selfstress modes of different kinds of cable-strut tensile structures is proposed by using the method of singular value decomposition and considering the symmetry and feasibility of the structure.
基于结构整体可行性和对称性、两次奇异值分解提出了一种求解各种索穹顶结构整体自应力模态的新方法。
4) integrity feasible prestress
整体可行预应力
1.
The concept of the integrity feasible prestressing is adopted and three different optimal design are studied on the cable-dome structures, which include prestress optimal design, section optimal design and shape optimal design.
采用整体可行预应力概念对索穹顶结构进行预应力优化、截面优化和形状优化设计。
5) integer dynamical response
整体动力响应
6) integrated stress analysis
整体应力分析
补充资料:工程技术人员对球罐做整体应力测试
工程技术人员对球罐做整体应力测试
工程技术人员对球罐做整体应力测试
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条