2) deep mine shaft construction
深井施工
1.
Design and material selection on drilling tools of raising boring machine for deep mine shaft construction;
深井施工用反井钻机钻具的选材和设计
3) deep standing well construction
深立井施工
1.
The paper introduces applied content and result in order to offer reference to deep standing well construction during drainage.
淄博矿业集团济北矿区唐口矿风井井筒深度1044m,在选择施工期间排水方案时,为了克服吊泵事故率高、维修不方便、投资大等缺点,改为吊盘上安装卧泵排水,取得了比较理想的效果,主要介绍了方案确定、具体实施内容及效果,可供处理大涌水量的深立井施工期间排水参考。
4) construction in deep water
深水施工
6) deepwater foundation construction
深水基础施工
1.
Taking Culudao Bridge as the example, this paper introduces the deepwater foundation construction of sea-crossing bridge, and expounds the key points of deepwater foundation construction of sea-crossing bridge.
以粗芦岛大桥为例,介绍了跨海桥深水基础施工的方法,并着重阐述了跨海桥深水基础施工中的要点。
补充资料:施工企业技术组织措施计划(见施工企业技术)
施工企业技术组织措施计划(见施工企业技术)
technical and organize measurement plan in construction enterprise
施工企业技术组织措施杯茹”岑,~‘_:_,organize measurement plan in eonstruetionenterPrise)见施工企业技米管理基本制度。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条