说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 冒落
1)  fall [英][fɔ:l]  [美][fɔl]
冒落
1.
The hing girder assorting with π type steel used in broken caving roof in Nanshan Coal Mine,Hegang Mining Bureau can not only solve the roof fall accident but also meet the needs of section mining support.
鹤岗矿务局南山煤矿在破碎易冒落顶板中 ,铰接顶梁与π型钢梁配套使用 ,不仅解决了顶板易发生的抽漏冒顶事故 ,而且满足了分层开采各分层顶板支护的要
2.
Through observing and analyzing to roof and wall of spot in 6114 workface,this paper sum up rules and features of rib spalling and roof fall under complicated geology condition in sub-level caving mining workface,it raises a series of roof control measures and gets good result.
通过对 6 114工作面顶板、煤壁现状的现场观测和理论分析 ,总结出了复杂地质条件下综放工作面煤壁片帮、端面顶板冒落的规律和特点 ,提出了一系列复杂地质条件下综放工作面顶板控制措施 ,现场应用后取得了较好的效
2)  Roof fall
冒落
1.
The roof falling types of worked out area in south mining district are pointed out, which are scattered falling and batch falling.
指出南区采空区顶板冒落形式 ,一是以散体形式零星冒落 ,另一是批量冒落
3)  roof falling
冒落
1.
To predict roof falling,AE field tests have been conducted and AE monitor holes are laid out based on the block analysis.
为了预报冒落事故,开展了声发射(AE)现场试验,并在块体分析的基础上布置了AE监测孔。
2.
To predict roof falling) AE field tests have been conducted and AE monitor holes are laid out based on the block analysis.
为了预报冒落事故,开展了声发射(AE)现场试验,并在块体分析的基础上布置了AE监测孔。
4)  cover rock caving
覆岩冒落
1.
Mechanism and protection on subsidence and cover rock caving of mining;
开采引起的覆岩冒落及地表沉陷的机理与防护
5)  caved gangue
冒落矸石
6)  falling of country rock
围岩冒落
补充资料:212113浇冒口清理滚筒操作规程
生产率:5吨/时
1、遵守铸造设备通用操作规程。
2、工作前还必须遵守:
a、 检查滚筒内部锰钢板是否松动、如有松动,应及时紧固好;
b、 检查滚筒体入口处是否与滑道相碰,如果相碰应于脱开;
c、 先点动试车,然后空运转2-3分钟,检查传动系统(电动机、联轴节、减速器)和滚筒体的运动是否平稳,确认一切正常后,方可进行生产。
3、工作中还必须遵守:
a、 开车时,先开通风机,后开滚筒。停车时,先停滚筒,后停通风机;
b、 经常注意进料情况,过宽过长的料不得进入滚筒内,以免卡住滚筒,使得滚筒体撬起,甩到地坑内,造成设备事故;
c、 滚筒进料时,操作人员不要在地坑内停留;
d、 设备开动时,如果滚筒压在挡轮上,应通知维修人员调整,以免引起轴瓦发热,甚至烧坏轴瓦;
e、 不许浇冒口积压在滚筒出口处,以免妨障滚筒体动动。
4、工作后滚筒体内的浇冒口应完全卸尽。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条