1) reconstruction engineering
改造工程
1.
On quality control of reconstruction engineering of trunk highway;
浅谈干线公路改造工程的质量控制
2.
The key points of supervision on drilled and bored concrete piles in launchway reconstruction engineering;
滑道改造工程钻孔灌注桩监理要点
3.
,the paper discussed the project management model of reconstruction engineering for Yunfeng Expressway.
从动态设计、动态施工、动态管理,厂拌冷再生基层,大修改造设计、施工方案,成本管理及质量管理等方面,叙述了运风高速公路改造工程项目管理模式。
2) reconstruction project
改造工程
1.
On reconstruction project of water supply in Tangshan by one household with one water meter;
浅谈唐山市自来水一户一表改造工程
2.
As more and more reconstruction projects arise in the construction ficld,there is a lack of effective cost management,and the reconstruction projects tend to cause fabrication cost to set out of control.
改造工程项目越来越多的出现在建筑工程中,由于缺乏有效的管理办法,改造工程项目往往出现造价失控和经济纠纷现象。
3.
Based on this reconstruction project of underpinning beams in Nanguo cinema,underpinning process flow,scheme optimization and construction design of prestressed temporary supporting structure,interface treatments of new and old reinforcement concrete structure are introduced as well as construction technologies of underpinning beam in difficult conditions.
本文基于南国影院大梁托换的改造工程,主要介绍结构托换施工的工序流程、预应力临时支撑结构的方案优化和施工设计、新旧钢筋混凝土结构的界面处理和困难条件下的托换大梁结构施工技术。
3) rebuilding project
改造工程
1.
Risk assessment on rebuilding project of the old industrial factory building;
旧工业厂房改造工程施工阶段的风险评估
2.
Old building quality check of rebuilding project in Shandong;
山东改造工程旧房质量检测
3.
Construction and supervision and control measure of central water pump station rebuilding project in Zhaoyuan County;
肇源县中心抽水站改造工程施工监理控制措施
4) modification works
改造工程
1.
In this paper, different features and application of modification works for old machine tool was analysed, and different control schemes with NC devices was given.
通过分析不同老式机床改造工程的特点和用途,提出了采用了不同数控设备的控制方案,并给出了相应的应用结果。
5) improvement project
改造工程
1.
Based on the example,this paper expatiates the design method of the improvement project fordyeing and finishing sewage treatment system.
本文结合实例,介绍了染整污水处理系统改造工程的设计方法。
2.
The cost of actual improvement project is 6?700?000 yuan, all investment will be regained in 9 years.
实际改造工程花费为 6 70万元 ,将在 9年全部收回投资。
补充资料:全国中小学危房改造工程
为了加快中小学危房改造步伐,国务院决定,从2001年开始在全国实施中小学危房改造工程。2001至2002年,已经成功实施了第一期全国农村中小学危房改造工程,中央和省(自治区、直辖市)共安排专项资金52亿元,其中,中央安排专项资金30亿元,累计改造农村中小学严重危房1700万平方米。2003年,国家又全面启动了第二期全国农村中小学危房改造工程,决定在2003至2005年共投入中央专款60亿元,基本消灭全国农村中小学现有d级危房校舍,目前该“工程”正在顺利实施。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条