说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 升级改造工程
1)  upgrading and rebuilding engineering
升级改造工程
1.
With design capacity of 170×10~4(m~3/d), the new structure of A/O biological nitrogen removal technology will be applied for the upgrading and rebuilding engineering in Shanghai Zhuyuan No.
上海市竹园第一污水处理厂升级改造工程处理规模为170×104m3/d,远期采用A/O生物脱氮工艺,近期按普通曝气工艺运行。
2)  upgrading [英]['ʌpgreid]  [美]['ʌp'gred]
升级改造
1.
Planning and Fulfilment of the Campus LAN Upgrading;
校园网升级改造的规划和实现
2.
Study on upgrading of second cooling control system in slab continuous cast
板坯连铸二冷控制系统升级改造的研究
3.
Thinking on Effective Management During the Upgrading Green Space
绿地升级改造过程中实施有效管理的思考
3)  upgrade [英][,ʌp'ɡreɪd]  [美]['ʌp'gred]
升级改造
1.
Approach of some topics about upgraded inductively coupled plasma spectrometers;
电感耦合等离子体光谱仪升级改造中几个问题的探讨
2.
According to many year s experience in operation and maintenance,the system at GPSPS is upgraded.
根据多年的运行管理经验对原系统进行了升级改造,增加了一些适用于抽水蓄能电厂或水电厂的管理模块,介绍了其实现方法,为抽水蓄能电厂和水电厂生产管理系统的建设和改造提供了有益的参考。
3.
The paper analyzes the reason of the fault,and proposes the upgrade scheme,and expounds its function,thus improves the economic efficiency of the station operation.
系统升级改造并实施后,提高电站安全运行水平及电能生产质量,形成一个完整的、先进的开放网络型分层分布的实时闭环过程控制系统,提高了电站运行的经济效益,逐步满足了现代电力企业发展要求及远方调度部门集控要求。
4)  Alteration [英][,ɔ:ltə'reɪʃn]  [美]['ɔltə'reʃən]
改造升级
1.
Practice and Consideration on Alteration of Large-Scale Analytical Instrument;
改造升级大型精密仪器的实践与思考
5)  upgrading and reconstruction
升级改造
1.
In the upgrading and reconstruction project,the bottom aeration oxidation ditch is reconstructed into a compound aerobic tank with pre-anoxic tank,and the anaerobic stage and the anoxic stage are hydraulically optimized.
此次升级改造,将原一期工程的底曝氧化沟改造成复合式好氧池,并配套前置缺氧池,对原二期工程的厌氧段、缺氧段进行水力优化,增加转盘式过滤器,使出水水质达到一级A排放标准,不需另外征地,可为类似污水处理厂升级改造提供参考。
2.
Through the prediction by the activated sludge models accorded with practical conditions of the two plants,a process optimization plan for ensuring the effluent quality to meet the discharge standard is put forward,which provides a scientific and economic method for upgrading and reconstruction of oxidation ditches in the northern China.
这为北方地区氧化沟工艺的升级改造提供了一个科学、经济的改造思路。
3.
The TUD model was applied to evaluate and optimize a modified A2/O process design which is an upgrading and reconstruction scheme of a large municipal WWTP in Beijing.
应用TUD模型对北京某大型市政污水处理厂的升级改造方案———改良A2/O工艺进行了模拟评价,结果显示:出水TP接近排放标准限值,存在超标排放风险;设置预缺氧池并不能促进生物除磷,反而会消耗进水中有限的VFAs;只要水解酸化作用能保持进水总COD中的VFAs含量>10%,即可获得较好的生物除磷效果;设置脱氧池对生物脱氮的促进作用十分有限。
6)  improvement project
改造工程
1.
Based on the example,this paper expatiates the design method of the improvement project fordyeing and finishing sewage treatment system.
本文结合实例,介绍了染整污水处理系统改造工程的设计方法。
2.
The cost of actual improvement project is 6?700?000 yuan, all investment will be regained in 9 years.
实际改造工程花费为 6 70万元 ,将在 9年全部收回投资。
补充资料:升级
1.谓从较低的级别升到较高的级别。 2.谓从较低的年级升到较高的年级。
说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条