说明:双击或选中下面任意单词,将显示该词的音标、读音、翻译等;选中中文或多个词,将显示翻译。
您的位置:首页 -> 词典 -> 工业广场煤柱
1)  coal-pillar of mine surface plant
工业广场煤柱
1.
The former Xie-er Coal Mine is divided into Mining Area 45 and Mining Area 47,in which Mining Area 45 is the coal-pillar of mine surface plant and Mining Area 47 is the coal-pillar of inclined shafts in the former Xie-er Coal Mine.
淮南矿业集团谢一矿和谢二矿并矿后,对矿井资源重新进行了划分,将原谢二矿划分为45和47两个采区,其中45采区为原谢二矿工业广场煤柱,47采区为谢二矿斜井煤柱;45采区原始设计方案影响其生产能力的充分发挥,同时也影响47采区的开采;通过对45采区设计进行优化,不仅缩短了45采区采掘接替周期,少布置685 m专用回风巷,同时提前解放了47采区B4~B8煤层,保证了矿井正常接替。
2)  shaft and industry square pillar
井筒与工业广场煤柱
3)  industry.coal-pillar
工业煤柱
4)  industrial square
工业广场
1.
The actuality of the environmental pollution which is produced in the development of the coal mine is analyzed and the environmental programming necessity of industrial square and residential area of coal mine is emphasized.
对煤矿企业在发展过程中产生的环境污染问题进行了分析,强调了煤矿工业广场和工人村进行环境规划的必要性。
5)  old industry square
老工业广场
1.
In order to solve the technical problems of freezing shaft in alluvium to Huaibei Taoyuan coal mine in old industry square,in site measurements of force and temperature impact of the out wall of mine shaft lining were conducted during the shaft sinking.
为解决淮北矿业集团桃园煤矿新副井井筒在老工业广场冲积层中冻结法凿井的技术难题,在施工过程中对外层井壁的受力和温度进行了实时监测,获得了老工业广场内复杂地质水文条件下井壁受力和温度的实测数据,通过实测信息反馈,实现了矿井动态设计和信息化施工。
6)  cylindrical briquette
圆柱状工业型煤
补充资料:独立广场

独立广场(merdeka squnre),是每年庆祝国庆的地点。国家独立是马来西亚历史上一个重要时刻。广场前身是球场。板球、曲根球、网球和橄榄球等多类球赛都曾在此举行,后将对面雪兰莪俱乐部的场地重新铺过草地,改成宏伟的广场,纪念国家独立。全世界最高的旗竿(高100米)耸立在广场南端,国旗迎风飘扬,草地上有一个扁圆形的黑色云石牌匾,标示1957年8月30日午夜英国国旗降下,马来西亚国旗首次升起的地点。

旁边的圣玛利天主教堂,则是已逾百年的哥德式建筑。走一小段路可达纪念图书馆,建于1909年。在独立广场下面的太子广场,是饮食、休闲、娱乐中心

说明:补充资料仅用于学习参考,请勿用于其它任何用途。
参考词条